Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Main & Sunset 2x1 Roundabout - Design Year (2045) Build Scenario 2 <br />Run number 53 <br />Project: Lino Lakes Northwest / Main Street Development2045 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2045 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Sunset Ave SB None 327 1118 109 766 0.4268 <br />2 Main St EB None 869 568 876 1225 0.7095 <br />3 Sunset Ave NB None 496 662 774 942 0.5265 <br />4 Main St WB None 750 478 680 1395 0.5375 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Sunset Ave SB None 8.58 8.58 3.75 A A <br />2 Main St EB None 18.70 18.70 27.32 C C <br />3 Sunset Ave NB None 8.24 8.24 5.23 A A <br />4 Main St WB None 9.19 9.19 8.95 A A <br />Page 518 of 679