Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Sunset & Lilac - 2030 No-Build <br />Run number 30 <br />Project: Lino Lakes NW/Main Street Development2030 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 AM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Sunset Ave SB None 491 44 179 1077 0.4560 <br />2 Lilac St NB None 139 480 55 901 0.1543 <br />3 Sunset Ave WB None 67 156 463 1081 0.0620 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Sunset Ave SB None 5.66 5.66 3.02 A A <br />2 Lilac St NB None 4.59 4.59 0.67 A A <br />3 Sunset Ave WB None 3.42 3.42 0.22 A A <br />Page 522 of 679