Laserfiche WebLink
Page 1 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Sunset & Lilac - 2030 No-Build <br />Run number 35 <br />Project: Lino Lakes NW/Main Street Development2030 PM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Operational Results <br />2030 PM Peak - 60 minutes <br />Flows and Capacity <br />Leg Leg Names Bypass <br />Type <br />Flows (veh/hr) <br />Arrival Flow <br />Entry Bypass <br />Opposing Flow <br />Entry Bypass <br />Exit <br />Flow <br />Capacity (veh/hr) <br />Capacity <br />Entry Bypass <br />Average VCR <br />Entry Bypass <br />1 Sunset Ave SB None 260 39 378 1144 0.2273 <br />2 Lilac St NB None 329 246 53 1033 0.3185 <br />3 Sunset Ave WB None 100 317 258 995 0.1005 <br />Delays, Queues and Level of Service <br />Leg Leg Names Bypass <br />Type <br />Average Delay (sec) <br />Entry Bypass Leg <br />95% Queue (veh) <br />Entry Bypass <br />Level of Service <br />Entry Bypass Leg <br />1 Sunset Ave SB None 3.94 3.94 0.81 A A <br />2 Lilac St NB None 4.92 4.92 1.30 A A <br />3 Sunset Ave WB None 3.90 3.90 0.31 A A <br />Page 524 of 679