Laserfiche WebLink
Page 2 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Sunset & Lilac - 2045 No-Build <br />Run number 38 <br />Project: Lino Lakes NW/Main Street Development2045 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Global Results <br />Performance and Accidents <br />2045 AM Peak Global Performance <br />Parameter Units Entries Bypasses Total <br />Arrive Flows veh/hr 786 786 <br />Capacity veh/hr 3035 3035 <br />Average Delay sec/veh 5.05 5.05 <br />L.O.S. (Signal)A – F A A <br />L.O.S. (Unsig)A – F A A <br />Total Delay veh.hrs 1.10 1.10 <br />Page 535 of 679