Laserfiche WebLink
Page 2 of 2Report dated 25-Apr-2025 <br />Rodel Version 1.96 <br />Scheme: Sunset & Lilac - 2045 Scenario 1 <br />Run number 68 <br />Project: Main Street Northwest2045 AM Peak <br />50% Confidence Level <br />Daylight conditions Rodel-Win1 - Full Geometry <br />Global Results <br />Performance and Accidents <br />2045 AM Peak Global Performance <br />Parameter Units Entries Bypasses Total <br />Arrive Flows veh/hr 1395 1395 <br />Capacity veh/hr 3207 3207 <br />Average Delay sec/veh 21.89 21.89 <br />L.O.S. (Signal)A – F C C <br />L.O.S. (Unsig)A – F C C <br />Total Delay veh.hrs 8.48 8.48 <br />Page 539 of 679