My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-11-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-11-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 8:42:09 AM
Creation date
8/12/2025 8:25:47 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/11/2025
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
679
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Natures Refuge North <br />Trunk Utility Agreement <br />August 11, 2025 <br /> page 2 <br />contractor shall be approved by the City in its absolute and sole discretion. The <br />Developer Improvements shall be constructed per the City Standard Specifications for <br />Construction January 2024. <br />The estimated cost of Developer Improvements is as shown on Exhibit B attached <br />hereto. All Developer Improvements shall require City inspection and approval and, <br />where appropriate, the approval of any other governmental agency having jurisdiction. <br />The Developer shall construct and install at the Developer's sole cost and expense the <br />following improvements according to the following terms and conditions: <br />a. Site Grading. Not applicable to this Agreement. There is a separate Grading <br />Agreement for Exhibit A property Resolution No. 25-66. <br />b. Site Improvements <br />i. The street right-of-way, storm water storage ponds, and surface water <br />drainage ways are to be graded per a separate early grading agreement. <br />Surface water management systems shall be maintained by the <br />Developer until they are accepted by the City. <br />ii. The Developer shall be responsible for ascertaining that site geotechnical <br />and groundwater conditions are adequate and conforming with the site <br />improvements as proposed. The Developer shall provide testing from an <br />approved testing company. <br />iii. The Developer shall install sanitary sewer, water, and storm sewer <br />utilities. The Developer’s engineer shall certify in writing, with an as-built <br />survey, that utility installation complies with the approved construction <br />plans. <br />iv. The Developer shall promptly clear dirt and debris within public rights-of- <br />way and drainage and utility easements resulting from construction by <br />the Developer, its purchasers, builders and contractors within five (5) <br />days after notification by the City. The Developer shall be responsible for <br />all necessary street and storm sewer maintenance, including street <br />sweeping, unless otherwise released by the City. <br />7. Time of Performance. The Developer shall install all required improvements <br />enumerated in Paragraph 6 by November 30, 2025. The Developer may request a <br />reasonable extension of time from the City, and the City will consider the extension in <br />its sole discretion. If the extension is granted, it shall be conditioned upon updating the <br />security posted by the Developer to reflect cost increases and the extended completion <br />date. <br />Page 641 of 679
The URL can be used to link to this page
Your browser does not support the video tag.