My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-25-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-25-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 8:35:53 AM
Creation date
9/2/2025 8:21:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/25/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />08/06/2025 <br />Page 8 <br />Java Properties - Lino Retail 2.0 Engineering Review <br />a. Lower water service and insulate below the existing basin <br />(DTE 3/11/2025) The utility plan has been revised per the comment <br />(WSB 4/2/2025) Show existing service <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />(DTE 6/19/2025) The existing service has been added to the plans. <br />(WSB 8/6/2025) Complete <br /> <br />6. Remove/abandon/seal all existing wells per Minnesota Department of Health <br />requirements. <br />(DTE 3/11/2025) Notes have been added to the Removal Plans stating the <br />information from the comment. <br />(WSB 4/2/2025) Complete <br /> <br />7. (WSB 4/2/2025) Provide 6” gate valve when connecting to the western water service <br />south of Marketplace Drive <br />a. Provide temporary hydrant or air release bleed pipe on southern end <br />(DTE 6/19/2025) A hydrant has been added in the location listed in the <br />comments. <br />(WSB 8/6/2025) Complete <br /> <br />8. (WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />(DTE 6/19/2025) Noted, see revised plans <br />(WSB 8/6/2025) <br /> <br /> <br />• Sanitary Sewer <br /> <br />Existing and proposed sanitary sewer services are provided for the 3 commercial lots <br />through existing and proposed City infrastructure on Lake Drive (CSAH 23) and the future <br />Market Place Drive. <br /> <br />Comments: <br />1. Coordinate with the City 2025 Market Place Drive Realignment Project for providing <br />the appropriately sized stubs at the appropriate locations <br />(DTE 3/11/2025) The latest design file provided by the City has been included in the <br />plans. <br />(WSB 4/2/2025) See comments and as-bid plans <br />(WSB 5/7/2025) City to provide two sets of utility stubs (6” PVC C900 water and 4” <br />PVC sanitary sewer with gate valves roughly at the easement line) <br />(DTE 6/19/2025) Plans have been updated with the 2025 Market Place Drive <br />(WSB 8/6/2025) Complete <br /> <br />2. Building A will utilize the existing 6” sanitary sewer service stub instead of installing a <br />new service wye <br />a. Cut back on the existing riser as necessary to lower the sanitary sewer <br />service and maintain minimum cover below the existing basin <br />(DTE 3/11/2025) The utility plan has been revised per the comment. <br />(WSB 4/2/2025) Show existing service <br />(WSB 5/7/2025) Comments remain from Lino Lakes 2.0 1st Addition <br />(DTE 6/19/2025) The existing service has been added to the plans. <br />(WSB 8/6/2025) Complete <br /> <br /> <br />Page 160 of 171
The URL can be used to link to this page
Your browser does not support the video tag.