My WebLink
|
Help
|
About
|
Sign Out
Home
Search
08-25-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
08-25-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2025 8:35:53 AM
Creation date
9/2/2025 8:21:06 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
08/25/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Lino Lakes Main Street - AUAR 82 August 2025 <br />Resource Area Mitigation <br />Scenario 1 and 2: Provide construction oversight to ensure designed sediment <br />and erosion control measures are being implemented. <br />Scenario 1 and 2: Future developers would complete a geotechnical report that <br />would provide recommendations for structural and foundation design based on the <br />soil types in the study area. <br /> <br /> Floodplains <br />Scenario 1 and 2: If any potential impacts are proposed to <br />FEMA 100-Year Floodplains as part of development within the <br />AUAR study area, the applicable City of Lino Lakes and RCWD <br />approvals will be obtained. Note: RCWD approvals are required <br />specifically to RCWD’s 100-year floodplains. <br />Scenario 1 and 2: Floodplain alterations will require submittal of <br />appropriate Letter of Map Change to FEMA to document <br />changes to floodplain boundaries. <br />Water <br />Resources <br />Wetlands <br />Scenario 1 and 2: Delineate wetlands in accordance with the <br />Army Corps of Engineers Wetlands Delineation Manual and <br />classify wetlands according to Wetlands of the United States <br />(Circular 39) and Wetlands and Deepwater Habitats of the <br />United States. <br />Scenario 1 and 2: Follow sequencing process of wetland <br />avoidance, minimization, rectification, and mitigation as outlined <br />in the Wetland Conservation Act (WCA) if wetlands area altered. <br />If any potential impacts are proposed to regulated wetlands as <br />part of development within the AUAR study area, the applicable <br />City of Lino Lakes, WCA, RCWD, and USACE permits will be <br />obtained. <br />Scenario 1 and 2: Required wetland buffers will be <br />incorporated into site design. <br />Ditches <br />Scenario 1 and 2: Realignment of the ACD system 10-22-32 is <br />proposed in both scenarios. A 20-foot buffer will be maintained <br />on each side of the ditch as required by RCWD to allow for <br />regular maintenance. Lino Lakes proposes an average buffer <br />width of 50 feet on either side to provide space for the greenway <br />corridor creation. The buffer zone will be clear of obstructions <br />such as trees and buildings. <br />Stormwater <br />Scenario 1 and 2: Stormwater BMPs will be constructed in <br />accordance with City, RCWD, and MIDS requirements as the <br />property is developed. <br />Scenario 1 and 2: Developers are encouraged to use best <br />practices to reduce chloride use in snow and ice removal. <br />Scenario 1 and 2: During construction, erosion and sediment <br />control BMPs will be implemented and maintained to prevent <br />impacts to aquatic ecosystems. <br />Scenario 1 and 2: Require stormwater management systems to <br />be developed in accordance with the current version of the Rice <br />Creek Watershed District Rules and Chapter 1011 of City Code, <br />as amended. <br /> <br /> <br />Lino Lakes Main Street - AUAR 83 August 2025 <br />Resource Area Mitigation <br />Scenario 1 and 2: Stormwater BMPs shall follow the order of <br />implementation of infiltration practices, water reuse, biofiltration, <br />wet sedimentation, unless site restrictions can be documented <br />to demonstrate that alternate practices can meet City and <br />RCWD stormwater requirements and approval by City and <br />RCWD. <br />Scenario 1 and 2: Any supplementary volume, sediment, and <br />other pollutants associated with stormwater originating offsite <br />that travels through the study area will be accounted for in the <br />final design of stormwater BMPs. <br />Scenario 1 and 2: The City will mandate an evaluation of the <br />feasibility of stormwater reuse for all residential and commercial <br />developments requiring urban services, such as municipal <br />water. The City will also recommend planting native and <br />drought-tolerant species to minimize irrigation requirements. <br /> <br />Water <br />Appropriation <br />Scenario 1 and 2: A DNR temporary water appropriation permit <br />will be obtained for any dewatering that will be needed for <br />construction. <br /> <br />Scenario 1 and 2: If any unknown wells are found within the <br />AUAR study area, the wells will be sealed and the sealings sent <br />to the Department of Health if the termination of the permit is <br />requested. <br /> <br />Scenario 1 and 2: The City will need to install new wells, Wells <br />No. 8 and 9, to serve the entirety of the study area and satisfy <br />City-wide water demands. <br /> <br />Scenario 1 and 2: Monitor water usage and do not permit new <br />development to proceed if it exceeds the capacity of the water <br />supply and distribution system. <br /> <br />Scenario 1 and 2: Construct the water supply and distribution <br />system in accordance with Minnesota Department of Health <br />standards and with the goals, policies, and recommendations <br />set forth in the city’s Comprehensive Water System Plan. <br />Water <br />Resources <br />Scenario 1 and 2: As necessary, amend the city’s <br />Comprehensive Water System Plan and Capital Improvement <br />Plan to be consistent with any future amendments or updates to <br />the Comprehensive Plan that would necessitate expansion or <br />alterations to the water system. <br />Scenario 1 and 2: Prepare a Wellhead Protection Plan <br />amendment for new wells and follow the adopted wellhead <br />protection plans for Lino Lakes. <br />Scenario 1 and 2: Continue to implement the City’s adopted <br />water conservation policies which are intended to attenuate <br />peak water demands throughout the City. <br />ATTACHMENT A - AUAR MITIGATION PLAN (CONT.) <br />MAPPING NORTHWEST MAIN - MAIN STREET MASTER PLAN <br />AUGUST 25, 2025 INDEX | 41Page 95 of 171
The URL can be used to link to this page
Your browser does not support the video tag.