Laserfiche WebLink
<br />Temporary Cul-de-sac Easement Exhibit prepared by Landform received on August 11, <br />2025 <br />Title Commitment dated August 4, 2025 <br />BACKGROUND <br />On July 14, 2025, the City Council passed Resolution No. 25-93 approving the preliminary plat. <br /> The Council staff report and resolution detail the project’s consistency with the City’s <br />Comprehensive Plan and compliance with the City Code. <br />This staff report provides updates to the July 14, 2025 Council staff report related to the <br />preliminary plat. Changes are either narratively described or shown as strikethrough <br />(deletions) or underline (additions). <br />ANALYSIS <br />Preliminary Plat <br />The preliminary plat contains 14 lots and 1 outlot. The outlot is for stormwater management. <br />The outlot will be owned by an HOA the City and the stormwater pond will be maintained by <br />the City. <br />The original plan set included a retaining wall on the two north lots. These retaining wall were <br />going to be maintained by an HOA. This retaining wall has been removed on the revised plan <br />set. If it is determined the retaining walls are still required, the property owners of the two lots <br />shall be responsible for the maintenance. <br />Final Plat <br />The final plat contains the same 14 lots and 1 outlot. <br />Phasing Plan <br />The development is proposed to be constructed in one (1) phase. <br />Public Land Dedication <br />The City will require cash in lieu of land dedication. At the July 7, 2025 Council Work Session, <br />the Council requested all 14 lots pay park dedication fees. After consulting with the City <br />Attorney, it was determined this would be reasonable since the existing house did not pay park <br />dedication fees. The Council also requested the trail be constructed at this time by the <br />developer. Trail construction costs will be credited to the developer. <br />2 <br /> <br />