Laserfiche WebLink
18.The project site falls within the I-35E AUAR study area. The proposed development will <br />be required to meet all requirements of the AUAR including mitigation measures. <br />19.Tree removal should be completed in the fall or winter to minimize impacts to migrating <br />or nesting bat populations <br />20.Provide a Blandings turtle mitigation plan, surmountable curb is provided to allow <br />turtles access off of the roads. <br />a.Blandings turtle flyer should be included with the plans and construction <br />documents. <br />Page 3 <br />