My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-08-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
09-08-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:41:23 AM
Creation date
9/22/2025 3:58:48 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />08/06/2025 <br />Page 6 <br />Nature Refuge North Addition Engineering Review <br />Applicant to verify water pressure is adequate for all locations within the development. The <br />watermain may need to be looped through the site, and the watermain will need to include a <br />12-inch diameter trunk watermain as identified in the Comprehensive Plan. All proposed <br />units are required to be on the municipal water supply. <br /> <br />Water infrastructure for the Natures Refuge North Addition has not yet been designed and <br />will need to be submitted for preliminary plat by the applicant. It is anticipated that the <br />existing 16” DIP trunk main on Haywood Drive will need to be extended north through the <br />development to the eastern boundary similar to what is shown in the City’s 2040 <br />Comprehensive Plan. A 12” stub will need to be extended to the west towards Arena Acres <br />and Andall Street. Otherwise, the development will include a water system with <br />predominately 8- inch diameter ductile iron pipe (DIP) water main with 1-inch Type K <br />copper services being extended to each lot, consistent with the original Natures Refuge <br />development. Water supply will need to be evaluated in conjunction with current pending <br />DNR water appropriation approvals. <br /> <br />Comments: <br />1. Connect to existing 16" DIP Watermain <br />Carlson (4/25/2025) Note added. <br />WSB (5/23/2025) Complete <br /> <br />2. Identify on all plans coordinating with utility (gas) provider for utility installation, <br />grading, and street construction <br />Carlson (4/25/2025) Note added. <br />WSB (5/23/2025) Complete <br /> <br />3. Verify potential conflicts at all utility crossings <br />a. Maintain minimum 18" separation from watermain/services <br />Carlson (4/25/2025) Watermain will be adjusted (lowered) as needed to <br />maintain separation from service crossings. This will be determined with final <br />plans. <br />WSB (5/23/2025) To be completed with final plans <br /> <br />b. Insulate when separation between storm sewer and watermain or forcemain <br />is less than 36" <br />Carlson (4/25/2025) Noted. To be shown on final plans. <br />WSB (5/23/2025) Complete <br /> <br />4. Provide barricades to protect the temporary hydrant at the ends of Street A and <br />Street C <br />Carlson (4/25/2025) Barricades added and called out on site plan. <br />WSB (5/23/2025) Complete – Future thru street sign to be added with final plat <br /> <br />5. Add a gate valve to the western leg of the Street C/D tee <br />Carlson (4/25/2025) Valve added <br />WSB (5/23/2025) Complete <br /> <br />6. Extend watermain and hydrant with Street B to Andall Street with this development <br />Carlson (4/25/2025) Street added and grading as been adjusted. <br />WSB (5/23/2025) Complete <br /> <br />7. WSB (5/23/2025) Show gate valve symbol at connection to existing <br />Carlson (6/6/2025) Revised. <br />Page 112 of 168
The URL can be used to link to this page
Your browser does not support the video tag.