My WebLink
|
Help
|
About
|
Sign Out
Home
Search
09-08-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
09-08-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/6/2025 10:41:23 AM
Creation date
9/22/2025 3:58:48 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
09/08/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />08/06/2025 <br />Page 9 <br />Nature Refuge North Addition Engineering Review <br />The City’s Engineering and Public Safety departments submit that the roadway <br />connection to Andall Street shall be constructed as detailed below. <br /> <br />Trails and sidewalks <br /> <br />A trail is proposed extending from the south end of the development at the connection <br />with Natures Refuge, to the north end of the development and branching west to one of <br />the new streets. Reference the City Planner’s report for trail and sidewalk detail. <br /> <br />Comments: <br />1. There is little to no significant impact on the adjacent streets and intersections due to <br />the trips expected to be generated by the proposed development. <br />Carlson (4/25/2025) Noted <br />WSB (5/23/2025) Complete <br /> <br />2. There is no difference in operations with or without the Andall Street access. <br />a. Improving Fire and Life Safety response to both neighborhoods (providing <br />additional means of access). <br />b. Connectivity of neighborhoods which generally results in a reduction of <br />overall vehicle miles traveled <br />c. Provides access for the existing neighborhood to sidewalks and trail system. <br />Also, can provide a far safer route to/from the school with almost no need to <br />walk/bike on CSAH 14. <br />Carlson (4/25/2025) Noted – Street added <br />WSB (5/23/2025) Complete <br /> <br />3. It may be beneficial to look into providing a trail extension from the school to <br />Basswood to provide a non-motorized connection to the school completely <br />independent from CSAH 14. <br />Carlson (4/25/2025) Noted <br />WSB (5/23/2025) To be further reviewed with final plans <br /> <br />4. The CSAH 14/Wood Duck intersection is expected to operate acceptably during full- <br />build scenarios, however it still would improve safety by providing exclusive left-turn <br />lanes on CSAH 14. Would get queueing vehicles out of the through lane and <br />eliminate the potential for through vehicles to use the right-tun lanes as bypass lanes. <br />Carlson (4/25/2025) Noted <br />WSB (5/23/2025) To be further reviewed with final plans <br /> <br />5. Andall Street should be constructed as a 24 foot wide roadway within the cleared <br />path from the watermain / fire hydrant extension to the Arena Acres Development. <br />The City will consider a sidewalk on one side of the roadway during the final plat <br />review. It is anticipated that approximately 15 trees will be removed with the <br />construction of the watermain and roadway. There will also be wetland impacts that <br />will need to be mitigated. <br />Carlson (4/25/2025) Street has been adjusted. <br />WSB (5/23/2025) Complete <br /> <br />6. Provide a striped crosswalk at the east end of Street C instead of having the trail <br />cross the road <br />Carlson (4/25/2025) Trail adjusted. Markings to be provided with final plans <br />WSB (5/23/2025) To be completed with final plans <br /> <br />Page 115 of 168
The URL can be used to link to this page
Your browser does not support the video tag.