Laserfiche WebLink
<br />Estimated project costs including surveying, site grading, bituminous court pavement with <br />aggregate base, net and post systems, and acrylic color surfacing is in the $75,000 - $85,000 <br />range. This does not include the cost of replacing the hockey boards/fencing. The acrylic <br />painting and striping ($12,000) will likely need to be redone every 2-3 years, due to the winter <br />flooding. <br /> <br /> <br />REQUESTED COUNCIL DIRECTION <br />Informational Purposes Only <br /> <br />ATTACHMENTS <br />None <br /> <br />Page 45 of 52