My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-13-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
10-13-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 3:32:34 PM
Creation date
10/23/2025 3:25:32 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/13/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />10/03/2025 <br />Page 5 <br />Erickson Property Development - Engineering Review <br />Pre- and Post- Development Discharge Rates (cfs) <br />Condition 2-Year 10-Year 100-Year 10-Day Snowmelt <br />Existing 9.64 15.23 32.09 Only needed if <br />basins landlocked <br />Currently <br />Proposed 4.31 6.46 12.40 Only needed if <br />basins landlocked <br /> <br />Comments: <br />1. This development falls within the Northeast Drainage Area Comprehensive <br />Stormwater Management Plan (CSMP) area and as such is beholden to additional <br />rate control and volume reduction requirements. <br />Landform Response (8/11/25) – Proposed outlet structure has been re-routed to the <br />existing south pond (Pond 500). See updated plans & stormwater report. <br /> <br />2. The pond south of this development was constructed with the Watermark <br />development and designed to include runoff from the Erickson Property. If rates are <br />reduced or maintained from existing conditions, volume control provided in the form <br />of stormwater reuse, and water quality treatment provided by the proposed pond, it is <br />recommended to overflow the onsite pond south to the existing Pond 500 (NWL 899, <br />HWL 904.3). This allows the proposed development to meet CSMP rate control <br />requirements by utilizing the existing Watermark system that already meets <br />requirements. <br />Landform Response (8/11/25) – Proposed outlet structure has been re-routed to the <br />existing south pond (Pond 500). See updated plans & stormwater report. <br /> <br />3. Why does PB-3 have water surface land cover modeled in HydroCAD? <br />Landform Response (8/11/25) – This should have been Type D soils. Updated. <br /> <br />4. The pond EOF must include riprap stabilization. <br />Landform Response (8/11/25) – Updated. See Plans. <br /> <br />5. The modeled pond EOF of 906.5 does not reflect the EOF of 905.57 in the plans. <br />Landform Response (8/11/25) – Model has been updated with an EOF of 905.57. <br /> <br />6. A detail must be provided for the pond outlet control structure. <br />Landform Response (8/11/25) – Plan and profiles have been included. <br />WSB Response (9/3/25) – The pond skimmer structure must include the rim <br />elevation and must match the grate modeled in HydroCAD. The submerged 12” pipe <br />is recommended to have an invert of 900 to ensure it remains submerged when the <br />pond is drawn down for irrigation. <br />Landform (8/11/2025) Pond skimmer has been updated in modeling to be at a <br />rim elevation of 908.0 in order to match the plans. 12" pipe has also been <br />lowered to elevation 900. See detail 1 on sheet C7.4. Also see sheet C3.1 and <br />sheet C5.1. <br />WSB (9/26/2025) Complete <br /> <br />7. The 10’ aquatic bench should continue around the entire pond. If that is not feasible, <br />the bench should at least be on the eastern side of the basin to provide a safety <br />bench for residents. <br />Landform Response (8/11/25) – Aquatic bench has been moved from western side to <br />eastern side of pond. <br />Page 124 of 145
The URL can be used to link to this page
Your browser does not support the video tag.