Ms. Katie Larsen <br />10/03/2025 <br />Page 7 <br />Erickson Property Development - Engineering Review <br />1. Provide utility profiles <br />Landform (8/11/2025) Updated - See plans <br />WSB (9/3/2025) Complete <br /> <br />2. Call out all utility crossings <br />a. Maintain minimum 18" separation <br />b. Insulate when separation between water (services/main) and storm sewer is <br />less than 36" <br />WSB (9/3/2025) Reference City watermain offset detail <br />Landform (8/11/2025) Acknowledged. <br />WSB (9/26/2025) Complete <br /> <br /> <br />3. Show existing watermain along Norway Ln <br />WSB (9/3/2025) Complete <br /> <br />4. Test the existing gate valve in Norway Ln <br />WSB (9/3/2025) Complete <br />a. If holding, utilize the existing gate valve in Norway Ln for testing <br />i. Do not connect to existing with a gate valve <br />b. Otherwise, remove watermain back to and including existing gate valve <br />i. Connect to existing with new 8” gate valve at that location <br /> <br />5. Utilize current utility as-builts/plans for Watermark 5th and 6th Additions <br />WSB (9/3/2025) Complete <br /> <br />6. WSB (9/3/2025) Show hydrant on plans <br />a. Adjust watermain as required such that hydrants are at all system high points <br />Landform (8/11/2025) Hydrant moved to high point. See updated sheet C4.1. <br />WSB (9/26/2025) Complete <br /> <br />7. WSB (9/3/2025) Maintain minimum (7.5') cover or insulate over watermain for <br />transition at the north end and watermain stub <br />Landform (8/11/2025) Insulation will be added to any locations where 7.5' cover <br />is not maintained. See updated sheet C4.1 <br />WSB (9/26/2025) Complete <br /> <br />8. WSB (9/3/2025) Remove gate valve and pipe at final watermain stub <br />back to hydrant tee <br />a. Gate valve will be installed with future extension <br />Landform (8/11/2025) GV has been removed. Temporary hydrant has been <br />repositioned and will be moved to property line for future development. See <br />updated sheet C4.1. <br />WSB (9/26/2025) Complete <br /> <br />9. WSB (9/3/2025) The northern most hydrant will be a temporary hydrant <br />a. -Hydrant will be shifted to lot line with future extension <br />Landform (8/11/2025) See response above. <br />WSB (9/26/2025) Complete <br /> <br />10. WSB (9/3/2025) Utility services should be out of driveways where possible <br />Page 126 of 145