Laserfiche WebLink
Ms. Katie Larsen <br />10/03/2025 <br />Page 10 <br />Erickson Property Development - Engineering Review <br />5. WSB (9/3/2025) Provide signage plan showing street/stop signs and street lighting <br />Landform (8/11/2025) See sheet C2.1 for street sign placement and street lighting <br />placement. <br />WSB (9/26/2025) Complete <br /> <br />6. WSB (9/3/2025) Vertical curves to meet 30 MPH design standard or provide reduced <br />speed signs <br />Landform (8/11/2025) Roadway will posted for 20 mph. See sheet C2.1 <br />WSB (9/26/2025) Complete <br /> <br />7. WSB (9/3/2025) Call out horizontal curves <br /> <br />a. Horizontal curves to meet 30 MPH design standard or provide reduced speed <br />signs <br />Landform (8/11/2025) Roadway will posted for 20 mph. See sheet C2.1 <br />WSB (9/26/2025) Complete <br /> <br /> <br />• Wetlands and Mitigation Plan <br /> <br />Site disturbances are in an upland location and wetland impacts are not proposed. <br /> <br />• Landscaping <br /> <br />A Landscape Plan for Erickson Property development has been submitted and will be <br />reviewed by staff and the City’s Environmental Coordinator. The Environmental Coordinator <br />will provide separate comments. <br /> <br />• Floodplain <br /> <br />No floodplain impacts are proposed on site. <br /> <br />• Drainage and Utility Easements <br /> <br />Roadways are proposed within right-of-way and lots include standard drainage and utility <br />easements. Larger drainage and utility easements will be required to be provided over <br />any utilities outside the right of way and any surface water management features <br /> <br />Comments: <br />1. Provide additional easement for the temporary cul de sac <br />Landform (8/11/2025) Temp. CDS/D&U expanded to include 1 feet beyond bit <br />edge. See sheet C2.1. <br />WSB (9/26/2025) Complete <br /> <br />2. Provide additional easement for drainage from one property to another <br />Landform (8/11/2025) All drainage from each lot is directed to the road, pond or <br />D & U easement. <br />WSB (9/26/2025) Complete <br /> <br />3. WSB Response (9/3/25) – The D&U easement between lots 1 and 2 of Block 1 must <br />be expanded to 20’ (10’ on either side of parcel line) to accommodate for the <br />Page 129 of 145