My WebLink
|
Help
|
About
|
Sign Out
Home
Search
10-13-25 - City Council Agenda
LinoLakes
>
City Council
>
City Council Meeting Packets
>
2025
>
Searchable Packets
>
10-13-25 - City Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2025 3:32:34 PM
Creation date
10/23/2025 3:25:32 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
10/13/2025
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> <br /> <br />BACKGROUND <br /> <br />On July 14, 2025, the City Council passed Resolution No. 25-93 approving the preliminary plat. <br />The Council staff report and resolution detail the project’s consistency with the City’s <br />Comprehensive Plan and compliance with the City Code. <br /> <br />This staff report provides updates to the July 14, 2025 Council staff report related to the <br />preliminary plat. Changes are either narratively described or shown as strikethrough <br />(deletions) or underline (additions). <br /> <br />ANALYSIS <br /> <br />Preliminary Plat <br /> <br />The preliminary plat contains 14 lots and 1 outlot. The outlot is for stormwater management. <br />The outlot will be owned by an HOA the City and the stormwater pond will be maintained by <br />the City. <br /> <br />The original plan set included a retaining wall on the two north lots. These retaining wall were <br />going to be maintained by an HOA. This retaining wall has been removed on the revised plan <br />set. If it is determined the retaining walls are still required, the property owners of the two lots <br />shall be responsible for the maintenance. <br /> <br />Final Plat <br /> <br />The final plat contains the same 14 lots and 1 outlot. <br /> <br />Phasing Plan <br /> <br />The development is proposed to be constructed in one (1) phase. <br /> <br />Public Land Dedication <br /> <br />The City will require cash in lieu of land dedication. At the July 7, 2025 Council Work Session, <br />the Council requested all 14 lots pay park dedication fees. After consulting with the City <br />Attorney, it was determined this would be reasonable since the existing house did not pay park <br />dedication fees. The Council also requested the trail be constructed at this time by the <br />developer. Trail construction costs will be credited to the developer. <br /> <br />Hampton Addition <br />Total # Units = 14 <br />Page 89 of 145
The URL can be used to link to this page
Your browser does not support the video tag.