|
Lino Lakes - Council and Administration
<br />
<br />
<br />(7) Building: construction utilities.
<br />
<br />(a) Building Permit Fee Schedule. Building permit fees shall be based on the Fee Table below.
<br />A fire suppression permit fee shall also be based on the Fee Table. There shall be a minimum fee of $73
<br />for all permits.
<br />
<br />(b) Fee Table.
<br />
<br />Total Valuation Fee
<br />$1 to $1,360 $73 $75
<br />$1,361 to $2,000 $23.50 for the first $500 plus $3.05 for each additional $100, or
<br />fraction thereof, to and including $2,000; min. fee is $73$75
<br />$2,001 to $25,000 $69.25 for the first $2,000 plus $14 for each additional $1,000,
<br />or fraction thereof, to and including $25,000
<br />$25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each additional
<br />$1,000, or fraction thereof, to and including $50,000
<br />$50,001 to $100,000 $643.75 for the first $50,000 plus $7 for each additional
<br />$1,000, or fraction thereof, to and including $100,000
<br />$100,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each additional
<br />$1,000, or fraction thereof, to and including $500,000
<br />$500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each additional
<br />$1,000, or fraction thereof, to and including $1,000,000
<br />$1,000,001 and up $5,608.75 for the first $1,000,000.00 plus $3.15 for each
<br />additional $1,000, or fraction thereof
<br />Page 43 of 166
|