Laserfiche WebLink
Fee Schedule <br /> <br /> <br />Type Amount <br />Delay penalty <br />For up to three days of non-completion and non- <br />prior notice before specified date. After three days <br />an additional charge of $10 per day will be levied. <br /> <br />For up to three days of non-completion and non- <br />prior notice before specified date. <br /> <br />After three days an additional charge will be levied. <br /> <br />$60 <br /> <br /> <br /> <br />$150 <br /> <br />$50 per day <br />Degradation fee <br />Degradation fee formula: <br />This formula covers degradation for the depreciation <br />caused by intrusion into the right-of-way and to the <br />overlays and seal-coats applied to the surface. The <br />formula includes life expectancy schedules for each <br />and has an estimated cost per square yard based on <br />the quality of the right-of-way surface required for <br />different levels of traffic. This formula creates a <br />degradation fee which is determined by the cost per <br />square yard per street, overlay, and seal-coat, <br />multiplied by the depreciation schedule, multiplied <br />by the area of the street patch. <br /> <br /> <br /> <br />(Cost per square yard for street <br />overlay and seal-coat x <br />depreciation schedule rates) x area <br />of street patch = degradation fee <br /> <br />(10) Utility fees. <br /> <br />(a) Water utility rates. <br /> <br />Type Amount/ Rate <br />Residential <br />Base fee $25/quarter/REU1 <br />Consumption fee <br />0 - 20,000 gallons $2.19 $2.28 per thousand gallons <br />20,001 - 40,000 gallons $2.43 $2.53 per thousand gallons <br />40,001 - 80,000 gallons $3.04 $3.16 per thousand gallons <br />Page 50 of 166