Laserfiche WebLink
Lino Lakes - Council and Administration <br />(7) Building: construction utilities. <br />(a) Building Permit Fee Schedule. Building permit fees shall be based on the Fee Table below. <br />A fire suppression permit fee shall also be based on the Fee Table. There shall be a minimum fee of $73 <br />for all permits. <br />(b) Fee Table. <br />Total Valuation <br />Fee <br />$1 to $1,360 <br />�3 $75 <br />$1,361 to $2,000 <br />$23.50 for the first $500 plus $3.05 for each additional $100, or <br />fraction thereof, to and including $2,000; min. fee is V-3 $75 <br />$2,001 to $25,000 <br />$69.25 for the first $2,000 plus $14 for each additional $1,000, <br />or fraction thereof, to and including $25,000 <br />$25,001 to $50,000 <br />$391.25 for the first $25,000 plus $10.10 for each additional <br />$1,000, or fraction thereof, to and including $50,000 <br />$50,001 to $100,000 <br />$643.75 for the first $50,000 plus $7 for each additional <br />$1,000, or fraction thereof, to and including $100,000 <br />$100,001 to $500,000 <br />$993.75 for the first $100,000 plus $5.60 for each additional <br />$1,000, or fraction thereof, to and including $500,000 <br />$500,001 to $1,000,000 <br />$3,233.75 for the first $500,000 plus $4.75 for each additional <br />$1,000, or fraction thereof, to and including $1,000,000 <br />$1,000,001 and up <br />$5,608.75 for the first $1,000,000.00 plus $3.15 for each <br />additional $1,000, or fraction thereof <br />