My WebLink
|
Help
|
About
|
Sign Out
Home
Search
19-25 - Ordinance - Fee Schedule
LinoLakes
>
City Council
>
City Council Ordinances
>
2025
>
19-25 - Ordinance - Fee Schedule
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 9:16:57 AM
Creation date
11/25/2025 9:15:53 AM
Metadata
Fields
Template:
City Council
Council Document Type
Ordinances
Ordinance #
19-25
Ordinance Title
Amending City Code Chapter 218, Fee Schedule
Ordinance Summary
Amending City Code Chapter 218, Fee Schedule
Ordinance Date Passed
11/24/02025
Ordinance Date Published
11/25/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lino Lakes - Council and Administration <br />Type <br />Aneouut <br />Inspections for which no fee is specifically designed <br />$74 $75/trip <br />Re -inspection fee <br />$7-3 $75/trip <br />Inspections outside of normal business hours <br />V-3 $75/hour <br />Irrigating or watering of new landscaping permit (sod or <br />seed) <br />$(nozee) No Fee <br />Lawn sprinkler/irrigation system permit <br />$7-3 $75 <br />Manufactured home permits <br />$250 <br />Mechanical (HVAC) fee: new construction residential <br />$158 (does not include <br />fireplaces) <br />Mechanical (HVAC) permit: commercial <br />2% of the contract price ($7-3 $75 <br />minimum fee) <br />Mechanical (HVAC) permit: gas fireplace <br />$73 $75 plus $34.50 for each <br />additional fireplace <br />Mechanical (HVAC) permit: residential <br />$,74 $75 except new construction <br />(includes AC/furnace combined) <br />Metropolitan Council SAC (sewer availability charge) <br />Per Met Council <br />Plan review fee <br />65% of the building permit fee <br />25% of the building permit fee <br />for review of similar plans <br />(master plan) in a 12 month <br />period <br />Plumbing permit <br />$11/fixture ($7-3. $75 minimum <br />fee <br />Retaining wall pert -nit <br />$7-3-$75 <br />Roofing permit <br />W61110 <br />Septic installation or repair permit <br />$250 <br />Septic pumping permit <br />$10 <br />Sewer connection inspection fee <br />$200 <br />Siding permit <br />$4- $110 <br />Sign permit: existing billboard <br />$85/year <br />Sign permit: permanent <br />See Building Fee Table <br />
The URL can be used to link to this page
Your browser does not support the video tag.