Laserfiche WebLink
Fee Schedule <br />Type <br />Amount <br />Delay penalty <br />For p t three days f no and n <br />�GT� completion <br />$ l 50 <br />1�L[fTG� Gill Qin'C�J-p'1TP0'II w..aua� ..vn <br />tiee b�f[jre�pc f date. After- t1„• e days - <br />��ivcic�ei-ra c� <br />10 .lay be levied <br />an additional eharge of per will <br />For up to three dais of non -completion and non- <br />prior notice before specified date. <br />After three days an additional charge will be levied. <br />$50 per day <br />Degradation fee <br />Degradation fee formula: <br />This formula covers degradation for the depreciation <br />caused by intrusion into the right-of-way and to the <br />(Cost per square yard for street <br />overlays and seal -coats applied to the surface. The <br />overlay and seal -coat x <br />formula includes life expectancy schedules for each <br />depreciation schedule rates) x area <br />and has an estimated cost per square yard based on <br />of street patch = degradation fee <br />the quality of the right-of-way surface required for <br />different levels of traffic. This formula creates a <br />degradation fee which is determined by the cost per <br />square yard per street, overlay, and seal -coat, <br />multiplied by the depreciation schedule, multiplied <br />by the area of the street patch. <br />(10) Utility fees. <br />(a) Water utility rates. <br />Type <br />Amount/ Rate <br />Residential <br />Base fee <br />$25/quarter/REU1 <br />Consumption fee <br />0 - 20,000 gallons <br />$1s3 $2.28 per thousand gallons <br />20,001 - 40,000 gallons <br />$2-.43 $2.53 per thousand gallons <br />40,001 - 80,000 gallons <br />$ 94 3.16 per thousand gallons <br />