Laserfiche WebLink
Page 2 <br />a. If this area is to be used buffer or treatment should be provided before <br />entering the city system. <br />12. Combine one of the three outlets if feasible on the West side of the infiltration <br />basin. Having three separate outlets will create maintenance issues along with <br />sediment build up <br />13. NPDES permit will be required for the project. Provide proof of permit before <br />construction. <br />a. Provide inlet protection in both CB adjacent to Kelly Street <br />b. Add note that street sweeping of adjacent impervious surface is required <br />by the authorization of the City Engineer. <br />c. Final Erosion control review will be completed with future submittals. <br /> <br />Page 42 of 406