Laserfiche WebLink
Smoke, Dust, Odors, Noise Minimal Typical construction activities. <br />Sewage Disposal (on-site)NA <br />Waste material Yes Typical construction waste material will be property disposed of. <br />Bulk storage (liquid)No <br />Radiation emission No <br />Electrical emission No <br />Exterior storage No <br />Off-Street Parking Required Proposed <br />Angle of parking 90 90 <br />Space Width 9 ft 9 ft <br />Space Length 18 ft 18 ft <br />Aisle Width One Way 24 ft 24 ft <br />Aisle Width Two Way 24 ft 24 ft <br />Curb cut access 30 feet from ROW <br />intersection 100+ ft <br />Curb cut access onto public street 40 feet <br />from one another 132 ft <br />Curb cut and driveway 5 feet from side yard 75 ft <br />10/29/2025 4 Site & Building Plan Worksheet-Lino Lakes Dealership & Office v2 <br />Page 46 of 406