My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/03/2012 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2012
>
01/03/2012 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 12:16:12 PM
Creation date
1/6/2014 11:40:07 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/03/2012
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WS — Item 3 <br />WORK SESSION STAFF REPORT <br />Work Session Item 3 <br />Date: January 3, 2012 <br />To: City Council <br />From: Michael Grochala <br />Re: Street Reconstruction Issues <br />Background <br />At the December 5th, 2011 work session the city council requested a list of issues <br />regarding street reconstruction. The reconstruction of city streets has been a highly <br />debated topic for the past two decades based, in part, on the city wide election <br />requirements contained in the City Charter and the continued degradation of public <br />infrastructure. <br />The City began using a computer software package to develop pavement condition <br />ratings in 1991. In 1995 the city developed street maintenance guidelines in response to a <br />failed charter amendment which sought to remove the city wide election requirements but <br />provide limitations on special assessments. In 1996 the city commissioned a street <br />reconstruction study and report. The study proposed a 5 phase street improvement <br />program to address deteriorating street conditions. In 1998 the Lakes Addition area <br />(phase 2) was reconstructed following a voter approved referendum. <br />Following the defeat of a referendum in 2003, to reconstruct West Shadow Lake Drive <br />and streets within the Shenandoah subdivision, the council commissioned preparation of <br />the Pavement Management Plan (PMP). This study established a comprehensive plan for <br />road maintenance and reconstruction including an evaluation of funding options and <br />policies to implement the PMP. As a result of the study, funding, through property tax <br />levy, was significantly increased for special maintenance activities including seal coating <br />and pavement overlays. However, the road reconstruction component has remained <br />unfunded following referenda defeats in 2005 and 2007. <br />In 2007 the city council appointed a citizen committee to review the charter provisions <br />pertaining to public improvements. The Citizen Task Force drafted a proposed charter <br />amendment that included the deletion of the city wide election while retaining a <br />neighborhood "Veto" process. This amendment was not submitted to voters however, <br />due to both a competing amendment proposed by the charter commission and an <br />amendment submitted by citizen petition. The petition amendment proposed changing <br />the charter improvement requirements to mirror state law. As required by law the <br />petition amendment was placed on the 2008 ballot for voter consideration. To avoid <br />
The URL can be used to link to this page
Your browser does not support the video tag.