My WebLink
|
Help
|
About
|
Sign Out
Home
Search
01/03/2012 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2012
>
01/03/2012 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 12:16:12 PM
Creation date
1/6/2014 11:40:07 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
01/03/2012
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OTTER LAKE ROAD EXTENSION - FEASIBILITY STUDY <br />STORM SEWER ENGINEER'S ESTIMATE - PHASE 1 <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA PROJECT NO. 14817.004 <br />12/22/2011 <br />ITEM <br />NO. <br />DESCRIPTION <br />UNIT <br />QUANTITY UNIT PRICE <br />TOTAL <br />AMOUNT <br />DIVISION 2 - STORM SEWER <br />1 <br />MOBILIZATION <br />1 <br />LS <br />$ 1,258.00 <br />$ 1,258.00 <br />2 <br />15" RCP CL. 5 STORM SEWER PIPE <br />40 <br />LF <br />$ 30.00 <br />$ 1,200.00 <br />3 <br />18" RCP CL. 5 STORM SEWER PIPE <br />170 <br />LF <br />$ 35.00 <br />$ 5,950.00 <br />4 <br />18" RCP FES WITH TRASH GUARD <br />1 <br />EA <br />$ 1,000.00 <br />$ 1,000.00 <br />5 <br />OVERFLOW CONTROL STRUCTURE ON POND <br />1 <br />EA <br />$ 3,500.00 <br />$ 3,500.00 <br />6 <br />OVERFLOW CONTROL STRUCTURE ON INFILTRATION AREA <br />1 <br />EA <br />$ 2,500.00 <br />$ 2,500.00 <br />7 <br />CATCH BASIN, TYPE 404 <br />2 <br />EA <br />$ 2,000.00 <br />$ 4,000.00 <br />8 <br />CATCH BASIN, TYPE 406 <br />2 <br />EA <br />$ 3,000.00 <br />$ 6,000.00 <br />9 <br />CL.3 RIPRAP W /GEOTEXTILE FILTER FABRIC <br />10 <br />CY <br />$ 100.00 <br />$ 1,000.00 <br />SUBTOTAL DIVISION 2 - STORM SEWER <br />$ 26,408.00I <br />CONTINGENCY <br />INDIRECT COSTS <br />TOTAL ESTIMATED STORM SEWER COST <br />5% <br />25% <br />$ 1,300.00 <br />$ 6,600.00 <br />$ 34,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.