My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
12/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 12:14:31 PM
Creation date
12/11/2025 12:14:16 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />12/03/2025 <br />Page 5 <br />Hill (11/10/2025) N/A. <br />18.BMP outlet slopes should match between HydroCAD modeling and utility plans <br />(ignoring backsloped skimmer pipes). <br />Hill (11/10/2025) Revised as recommended. <br />19. Based on the modeled results, culvert 2P will overtop Peltier Lake Dr in all storm <br />events. Potential pipe replacement should be explored to minimize road overtopping. <br />Hill (11/10/2025) The road overtops in the existing condition. The proposed condition <br />improves the situation by reducing the flooding frequency. <br />WSB (12/3/2025) Dual culverts are still recommended to further reduce overtopping. <br /> <br />20. What is the purpose of the southern node of Pond 2.6? If it is proposed to be <br />excavated for additional onsite fill, please label it separately as a lake to be <br />consistent with other developments in the City. <br />Hill (11/10/2025) The deep pond cells are excluded from the dead storage <br />calculations. Upstream NURP dead storage provide the required water quality. <br />21. What is the purpose of the eastern node of Pond 4.1? If it is proposed to be <br />excavated for additional onsite fill, please label it separately as a lake to be <br />consistent with other developments in the City. <br />Hill (11/10/2025) The deep pond cells are excluded from the dead storage <br />calculations. Upstream NURP dead storage provide the required water quality. <br />22. All proposed pond overflows need riprap stabilization. <br />Hill (11/10/2025) Will be detailed/included with final plans. <br />WSB (12/3/2025) Noted, remains an open comment. <br /> <br />23. Erosion control blankets are needed on all slopes 4:1 and steeper, including pond <br />slopes above the OLE. <br /> Blanket is proposed on all slopes steeper than 4:1. If blanket is <br />Hill (11/10/2025) <br />required on 4:1 slopes, it will be included with the final plans. <br />WSB (12/3/2025) It is not clear based on the hatching of the erosion control sheets if <br />pond slopes will get erosion control blankets or just wet ditch seeding. Additionally, <br />erosion control blankets will be needed for the proposed steep slopes west of the <br />intersection of Streets G and H. <br /> <br />24.Review tree planting against storm sewer plans to minimize overlap and reduce <br />potential root intrusion on storm sewer. For example, trees near the pipe between <br />CBMH-407 – STMH-406 and CBMH-251 – FES-250 should be shifted farther from <br />the pipe alignment. <br />Hill (11/10/2025) Landscape plan has been revised to the new site plan and utility <br />layout as recommended. <br />25. Tree plantings should be removed from the 60” trunkline easement boundary to avoid <br />potential future maintenance concerns. <br />Hill (11/10/2025) Revised as recommended. <br />26. WSB (12/3/2025) Pond 6 should have a 10’ bench, at least on the side nearest <br />homes for safety. <br /> <br /> <br />Peltier Ponds Development - Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.