My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
12/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 12:14:31 PM
Creation date
12/11/2025 12:14:16 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Katie Larsen <br />12/03/2025 <br />Page 11 <br />2.The pipe run from CBMH-105 to CBMH-103 seems to exceed 10’ in depth so the <br />easement corridor overtop must be increased from 20’ to at least double the width of <br />pipe depth for a 1:1 trench footprint. <br />Hill (11/10/2025) Storm sewer has been reconfigured, including the corresponding <br />easements, as recommended. <br />3. All utilities outside the right of way require an easement that meets a 1:1 slope with <br />the utility invert (minimum 20') <br /> Utilities have been reconfigured, including the corresponding <br />Hill (11/10/2025) <br />easements, as recommended. <br />WSB (12/3/2025) Some utilities require additional easement <br /> <br />4. All grading and construction in the Electric Transmission line utility easement to be <br />approved by the utility provider <br />Hill (11/10/2025) Coordination with GRE is ongoing, including potential pole <br />relocation, if needed. <br />WSB (12/3/2025) Complete - Continue coordination <br />5. WSB (12/3/2025) STM-524 to STM-523 pipe alignment overlaps with the property <br />limits for Lot 4 of Block 24. This alignment needs to shift east to provide sufficient <br />setback to property limits. <br /> <br />6. WSB (12/3/2025) STM-535 structure is adjacent to the property limits for Lot 4/5 of <br />Block 27. This structure needs to shift east to provide sufficient setback to property <br />limits. <br /> <br />7. WSB (12/3/2025) OCS-3 to EX-107 pipe alignment is ~11’ deep at the SE corner of <br />Lot 3 of Block 14, however there is only ~6’ of distance to the D&U line of the lot. The <br />alignment or D&U limits must shift to allow sufficient separation. <br /> <br /> <br /> Development Agreement <br /> <br />A development agreement will be required with the final plat. <br /> <br /> Grading Agreement <br /> <br />A grading agreement is not required at this time. <br /> <br />• Stormwater Maintenance Agreement <br /> <br />The stormwater maintenance for public facilities in the Peltier Ponds development will be <br />covered under the City’s Programmatic Stormwater Management Agreement after the <br />facilities have been installed and accepted by the City. Borrow areas / Lakes area will be <br />maintained by the HOA. <br /> <br />• Permits Required <br /> <br />Required permits will be determined at the time of preliminary plat submittal. Potential <br />permits may include some of the following and others: <br /> <br />Peltier Ponds Development - Engineering Review <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.