My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/10/2025 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2025
>
12/10/2025 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2025 12:14:31 PM
Creation date
12/11/2025 12:14:16 PM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Packet
Meeting Date
12/10/2025
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Environmental Memo <br />To: Katie Larsen, City Planner <br />From: Tom Hoffman, Environmental Coordinator <br />Date: December 3, 2025 <br />Re: Environmental Comments – Peltier Ponds <br />Environmental Board had recommended the following at their June 25, 2025 meeting: <br /> <br /> <br />1.Provide increased buffer widths around wetland where the trail is going past these <br />locations. Buffers should be extended throughout the park land to provide <br />pretreat of runoff before discharging to the wetlands. <br />a. Show buffers in between the trail and existing channel shown on the <br />proposed plans. <br />b. All wetlands should be included in conservation easements. <br />i. Will be completed with final plat <br />c. This area is included in the RCWD wetland corridor plan. With future <br />submittals impacts and mitigation of wetlands will be required. <br />i. Wetlands falling within the wetland corridor will require 50’ buffers <br /> <br />2. The project will disturb more than an acre of soil and will be required to obtain an <br />NPDES permit. Proof of permit shall be required before construction. <br /> <br />a. A SWPPP shall be required in additional submittals as required by the <br />MPCA meeting sections 5.2-5.26 <br />b. Final erosion and sediment control will be reviewed with future submittals <br />c. Plans show rock construction entrance in the legend. Does not appear to <br />be shown on the plan sheet. Call out the location on the plans. <br />d. Redundant perimeter control will be required around all wetlands onsite <br />where a 50’ natural buffer cannot be maintained during construction. <br />Redundant perimeter control should be spaced 3-5’ apart. <br />i. Symbols blend into the proposed “wet ditch” seed mix on sheet <br />C3.1. Confirm redundant perimeter is being provided <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.