My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/26/2012 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2012
>
03/26/2012 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 1:08:48 PM
Creation date
1/7/2014 10:21:34 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/26/2012
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />AGENDA ITEM 6B <br />STAFF ORIGINATOR: Michael Grochala <br />COUNCIL MEETING DATE: March 26, 2012 <br />TOPIC: i. Resolution No. 12 -30, Approving Joint <br />Powers Agreement with Anoka County, Birch <br />St. /Ware Rd. Traffic Signals <br />VOTE REQUIRED: <br />INTRODUCTION: <br />ii. Resolution No. 12 -31, Approving Joint <br />Powers Agreement with Anoka County, <br />Lake /Main Traffic Signals <br />Simple Majority <br />Anoka County has provided the City with a Joint Powers Agreement for the installation of traffic <br />signal improvements for the both the Lake /Main and Birch/Ware intersections. The agreement sets <br />forth the roles and responsibilities of both the County and City for construction of the <br />improvements. <br />BACKGROUND: <br />In 2010 city residents approved an election to allow for the improvement of the two intersections. <br />The City Council authorized preparation of plans and specification in January of 2010. The project <br />is being undertaken as a City project with the associated costs shared with Anoka County in <br />accordance with the County cost sharing policy. <br />Under the terms of the Joint Powers Agreement the estimated share of each project for both parties <br />is as follows: <br />Project <br />County <br />City <br />Total <br />Birch Street/Ware Road <br />193,324 <br />839,311 <br />1,032,635 <br />Lake Drive /Main Street <br />670,825 <br />581,145 <br />1,251,970 <br />Totals* <br />864,149 <br />1,420,456 <br />2,284,606 <br />*Total includes engineering, ROW, Construction. Does not include bond issuance costs <br />As part of the project Anoka County will be funding pedestrian improvements to the Market Place <br />Drive intersection. Pedestrian safety issues at this intersection were raised at the project open house <br />in February. These improvements will include a crosswalk, pedestrian timers and sidewalk. The <br />County will also be funding an overlay from 77th Street to the southern Lake /Main intersection <br />project limits. <br />
The URL can be used to link to this page
Your browser does not support the video tag.