My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/09/2012 Council Packet (2)
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2012
>
04/09/2012 Council Packet (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 1:24:37 PM
Creation date
1/7/2014 12:32:42 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/09/2012
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />CITY COUNCIL <br />AGENDA ITEM 6A <br />STAFF ORIGINATOR: Jason C. Wedel, City Engineer <br />MEETING DATE: April 9, 2012 <br />TOPIC: Consider Resolution No. 12 -33 Approving Change Order No. 1 for <br />the Otter Lake Service Road Culvert Replacement Project <br />VO1 E REQUIRED: 3/5 Vote Required <br />BACKGROUND <br />On May 23, 2011, the City Council approved awarding a contract to Amt Construction for the <br />replacement of a failed culvert beneath the Otter Lake Service Road. The replacement of the <br />culvert was substantially completed last summer and the new culvert is now in place. <br />As part of the construction of the new culvert it was necessary to remove the existing guardrails. <br />During this removal it was discovered that the existing posts supporting the guardrail were <br />deteriorating below ground and could not be reused. It was therefore necessary to supply new posts <br />and a section of rail beam to reinstall the guardrail. Public Works did not have any replacement <br />materials on hand. The guardrail was reinstalled with new steel posts, anchors, and a rail beam by <br />the contractor. <br />The cost to replace the posts and rail beam was $5,450 which equates to 5.5% of the original <br />contract amount. The revised project cost breaks down as follows: <br />Original Contract <br />Change Order No. 1 <br />Revised Contract <br />$98.254.00 <br />$ 5,450.00 <br />$103.70433 <br />RECOMMENDATION <br />Staff recommends adoption of Resolution 12 -33 Approving Change Order No. 1 for the Otter Lake <br />Service Road Culvert Replacement Project <br />P27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.