Laserfiche WebLink
f <br />0 <br />f <br />0 <br />0 <br />K <br />F <br />10 <br />0 <br />J <br />a <br />U <br />5P <br />A <br />O <br />:1<R <br />pWW <br />} � M <br />Previously Assessed (Fund 423) <br />Other. Sewer Utility Fund <br />N <br />E <br />E <br />E <br />m m <br />w("n3 <br />rJ00 <br />000 <br />Other. Sewer Utility Fund <br />Plan does not include Activities Considered as Ongoing Maintenance or Equipment for San.Swr or Water <br />1Lb,Uuu <br />490,000 <br />25,000 <br />17,000 <br />75,000 <br />45,000 <br />i o0 0o Oo 00 00 oO Oo o <br />°000 0000,no <br />D! Of O� ON' (OM <br />-° . Nmm'N.M <br />§ § o 00 o Oo 0 0o 1 <br />ogo voSo. <br />V) O '4 00c <br />-MIv meoMf <br />J,UJJ,YVU <br />140,000 <br />568,000 <br />50,000 <br />45,000 <br />803,000 <br />145,000 <br />596,000 <br />3,875,100 <br />45,000 <br />4,681,100 <br />V <br />m <br />T <br />JX <br />@ <br />F- <br />u. <br />00 0 "' <br />O O O <br />N N N <br />l- Q f0 <br />0 0' <br />0 0 0 O <br />C O N <br />V1 <br />o 0 0 " <br />000 ' <br />O <br />01bUUU <br />140,000 <br />588,000 <br />50,000 <br />758,000 <br />145,006 <br />596,000 <br />741,000 <br />3,485,000 <br />Bonding <br />C <br />O <br />U <br />. 0 „ ' <br />0 <br />m <br />r <br />O <br />W <br />� <br />00 i <br />O <br />c <br />O <br />M <br />to <br />O <br />N <br />r <br />"'888888"8 <br />O 0oui O <br />_ N V1 N N 0 0 <br />C - P A., m 0 <br />- N <br />sts N <br />1 <br />O <br />00 <br />N <br />P , <br />Om <br />Y <br />O <br />775,020 <br />775,020 <br />12th Ave (Birch to Holly Dr) (MSA) <br />Booster Station <br />Well No. 7 <br />2.5 M gal Ground Storage <br />Raw watermain to wells 1,3,5 and 6 <br />Water Treatment Plant <br />Redundant 16" Watermain Loop (Birch St) <br />LL <br />§22 <br />m <br />0 <br />H <br />it <br />N <br />45,000 <br />0 0 <br />A a <br />N <br />292,500 <br />45,000 <br />100,000 <br />145,000 <br />45,000 <br />45,000 <br />45,000 <br />45,000 <br />572,500 <br />C <br />O <br />U <br />MSAS <br />a <br />W <br />O <br />r <br />O) O <br />r v <br />40,000 <br />1 118,500 <br />17,000 <br />75,000 <br />Oa 0000 ,°p. <br />° tON 0 N <br />O <br />v <br />O M <br />N <br />340,000 <br />2,524,500 <br />0 <br />c <br />te <br />a <br />Surface Water Management Project <br />Seal Coat and Overlay Project <br />2015 Reconstruction Feasibility Study' <br />Wellhead Protection Plan Amendment <br />Well No. 6 & Pumphouse Design <br />Sanity ry Sewer Rehab <br />Total <br />Surface Water Management Project <br />Seal Coat and Overlay Project <br />Cedar Street <br />2015 Reconstruction Feasibility Study' <br />Well No. 6 & Pumphouse <br />Trunk Water Main BDD to Aqua (Fees. Stdy) <br />Sanitary Sewer Rehab <br />Woodrldge Estates Trunk Watemtain Fart <br />total <br />Surface Water Management Project <br />Seal Coat and Overlay Project <br />RMP Implementation w /RCWD <br />2015 Street Reconstruction' <br />Sanitary Sewer Rehab <br />Water Tower No. 1 Exterior Renovation <br />Trunk Walermaln Pork Ct In Marshan Lane _ <br />total <br />Surface Water Management Project <br />Seal Coat and Overlay Project <br />2017 Street Reconstruction Feasibility Study' <br />Sanitary Sewer Rehab <br />Total <br />Surface Water Management Protect <br />Seal Coat and Overlay Project <br />2017 Street Reconstruction' <br />Sanitary Sewer Rehab <br />Total <br />2013 TO 2017 TOTALS <br />} <br />M <br />N <br />Plan does not include Activities Considered as Ongoing Maintenance or Equipment for San.Swr or Water <br />Draft 2012 - 2016 CIP <br />'888§8888' O O O O O O O O r <br />O,OO COM O <br />V1 N IN V1 10 V) 0 0 <br />A N Of N 1 0) <br />iO.--N C mtn_go <br />J r .-,ON <br />a <br />H <br />EVENUES <br />m O <br />J% VI <br />W <br />F <br />a <br />0 <br />515,696 <br />V <br />m <br />O <br />O <br />0. <br />2 M <br />< <br />LL <br />7. <br />PROJECT R <br />m <br />0 <br />C <br />O <br />U <br />°o <br />N o <br />< `.. <br />N <br />2 <br />1,013,500 <br />O <br />N <br />b <br />1 <br />M <br />to <br />O <br />N <br />r <br />"'888888"8 <br />O 0oui O <br />_ N V1 N N 0 0 <br />C - P A., m 0 <br />- N <br />sts N <br />1 <br />O <br />00 <br />N <br />■ <br />FUTURE PROJECTS <br />12th Ave (Birch to Holly Dr) (MSA) <br />Booster Station <br />Well No. 7 <br />2.5 M gal Ground Storage <br />Raw watermain to wells 1,3,5 and 6 <br />Water Treatment Plant <br />Redundant 16" Watermain Loop (Birch St) <br />§22 <br />m <br />0 <br />H <br />it <br />N <br />Draft 2012 - 2016 CIP <br />