My WebLink
|
Help
|
About
|
Sign Out
Home
Search
12/10/2012 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2012
>
12/10/2012 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 4:39:01 PM
Creation date
1/14/2014 1:09:33 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
12/10/2012
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Item <br />No. <br />Item <br />Description <br />Units <br />Unit Price <br />Contract <br />Quantity <br />Quantity to <br />Date <br />Current <br />Quantity <br />Amount to <br />Date <br />149 <br />2531.501 <br />CONCRETE CURB & GUTTER DESIGN B618 <br />LIN FT <br />$12.12 <br />1228 <br />764 <br />18 <br />$9,259.68 <br />150 <br />2531.618 <br />TRUNCATED DOMES <br />SQ FT <br />$35.80 <br />232 <br />140 <br />56 <br />$5,012.00 <br />151 <br />2535.501 <br />BITUMINOUS CURB <br />LIN FT <br />$5.30 <br />260 <br />360 <br />360 <br />$1,908.00 <br />152 <br />2540.602 <br />WHEEL STOPS <br />EACH <br />$64.00 <br />21 <br />21 <br />21 <br />$1,344.00 <br />153 <br />2540.602 <br />INSTALL MAIL BOX AND SUPPORT <br />EACH <br />$51.00 <br />11 <br />34 <br />34 <br />$1,734.00 <br />154 <br />2540.602 <br />MAIL BOX SUPPORT <br />EACH <br />$102.00 <br />11 <br />34 <br />34 <br />$3,468.00 <br />155 <br />2554.509 <br />GUIDE POST TYPE B <br />EACH <br />$61.00 <br />6 <br />6 <br />6 <br />8386.00 <br />156 <br />2563.601 <br />TRAFFIC CONTROL <br />LUMP SUM <br />$27,619.00 <br />1 <br />1 <br />0.1 <br />$27,619.00 <br />157 <br />2564.531 <br />SIGN PANELS TYPE C <br />SQ FT <br />$35.80 <br />99 <br />99 <br />99 <br />$3,544.20 <br />158 <br />2564.537 <br />INSTALL SIGN TYPE C <br />EACH <br />$86.90 <br />28 <br />28 <br />28 <br />$2,433.20 <br />159 <br />2564.602 <br />INSTALL DELINEATOR <br />EACH <br />$77.00 <br />2 <br />2 <br />2 <br />$154.00 <br />160 <br />2565.511 <br />TRAFFIC CONTROL SIGNAL SYSTEM A <br />SIG SYS <br />$191,288.00 <br />1 <br />0.7 <br />0.1 <br />$133,901.60 <br />161 <br />2565.601 <br />EMERGENCY VEHICLE PREEMPTION SYSTEM A <br />LUMP SUM <br />$4,194.00 <br />1 <br />0 <br />0 <br />$0.00 <br />162 <br />2565.616 <br />REVISE SIGNAL SYSTEM <br />SYSTEM <br />$4,501.00 <br />1 <br />0.7 <br />0.7 <br />$3,150.70 <br />163 <br />2573.530 <br />STORM DRAIN INLET PROTECTION <br />EACH <br />$53.00 <br />5 <br />10 <br />5 <br />$530.00 <br />164 <br />2573.540 <br />FILTER LOG TYPE COMPOST LOG <br />LIN FT <br />$1.50 <br />500 <br />980 <br />595 <br />$1,470.00 <br />165 <br />2573.502 <br />SILT FENCE, TYPE MACHINE SLICED <br />LIN FT <br />$2.10 <br />400 <br />400 <br />400 <br />$840.00 <br />166 <br />2573.601 <br />CULVERT END PROTECTION <br />LUMP SUM <br />$320.00 <br />1 <br />1 <br />0 <br />$320.00 <br />167 <br />2573.602 <br />TEMPORARY ROCK CONSTRUCTION ENTRANCE <br />EACH <br />$533.00 <br />1 <br />0 <br />0 <br />$0.00 <br />168 <br />2575.501 <br />SEEDING <br />ACRE <br />$1,535.00 <br />1.05 <br />1 <br />1 <br />$1,535.00 <br />169 <br />2575,502 <br />SEED MIXTURE 350 <br />POUND <br />$4.30 <br />89 <br />80 <br />80 <br />$344.00 <br />170 <br />2575.511 <br />MULCH MATERIAL TYPE 3 <br />TON <br />$383.00 <br />2.1 <br />0 <br />0 <br />$0.00 <br />171 <br />2575.519 <br />DISK ANCHORING <br />ACRE <br />$184.00 <br />1.05 <br />1 <br />1 <br />$184.00 <br />172 <br />2575.532 <br />FERTILIZER TYPE 4 <br />POUND <br />$1.00 <br />157.5 <br />150 <br />150 <br />$150.00 <br />173 <br />2582.501 <br />PAVT MSSG (RT ARROW) PREFORMED THERMOPLASTIC <br />EACH <br />$307.00 <br />7 <br />7 <br />7 <br />$2,149.00 <br />174 <br />2582.501 <br />PAVT MSSG (LT ARROW) PREFORMED THERMOPLASTIC <br />EACH <br />$307.00 <br />8 <br />6 <br />8 <br />$2,456.00 <br />175 <br />2582.502 <br />4" SOLID LINE WHITE -EPDXY <br />LIN FT <br />$0.39 <br />15805 <br />18700 <br />18700 <br />$7,293.00 <br />176 <br />2582.502 <br />4" SOLID LINE YELLOW -EPDXY <br />LIN FT <br />$0.39 <br />2000 <br />1489 <br />1489 <br />$580.71 <br />177 <br />2582.502 <br />4" BROKEN LINE YELLOW -EPDXY <br />LIN FT <br />$0.39 <br />3420 <br />590 <br />590 <br />$230.10 <br />178 <br />2582.502 <br />4" DOUBLE SOLID LINE YELLOW -EPDXY <br />LIN FT <br />$0.78 <br />7005 <br />5496 <br />5496 <br />$4,286.88 <br />179 <br />2582.502 <br />24" SOLID LINE WHITE- PREFORMED THERMOPLASTIC <br />LIN FT <br />$21.33 <br />186 <br />124.6 <br />124.6 <br />$2,657.72 <br />180 <br />2582.502 <br />24" SOLID LINE YELLOW - PREFORMED THERMOPLASTIC <br />LIN FT <br />$21.83 <br />575 <br />567.2 <br />567.2 <br />$12,381.98 <br />181 <br />2582.503 <br />CROSSWALK MARKING- PREFORMED THERMOPLASTIC <br />SQ FT <br />$11.76 <br />1062 <br />756 <br />756 <br />$8,890.56 <br />Totals For Project 2 - Lake Drive (CSAH 23) Main Street (CSAH 14): <br />$875,997.57 <br />Project Totals: <br />$1,334,566.64 <br />Page 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.