Laserfiche WebLink
• <br />• <br />• <br />Fox Den Acres, page 5 <br />Traffic: The developer submitted a traffic study with the previous application for 64 lots. <br />The original study did not recognize the completion of West Shadow Lake Drive through to 62nd. <br />St. or the reconstruction of 62nd St. Staff made the developer's consultant aware of this, and an <br />amended study takes into account the current and planned roadways. The result is that the Birch <br />St. approach and intersection will continue to operate at a level of service C. The City's <br />transportation analysts have reviewed the study and agreed with its conclusions. <br />Existing residents have voiced the concern that they do not want additional traffic on the roads. <br />Utilities: City water and sanitary sewer service will connect to existing facilities in Fox <br />Road. Both are adequate to serve the project. <br />Grading and Stormwater Management: The redesign includes relocating smaller wetland <br />areas of lesser quality and mitigating (recreating) them in areas that will increase the higher <br />quality wetlands. The design also includes infiltration methods that will help filter water prior to <br />running into ponds or wetlands. <br />Existing residents have expressed concern about stormwater ponds that serve their <br />neighborhoods. The existing, natural drainage of the site includes a relatively small area that <br />drains to the northwest. The remainder of the site currently drains to the north, east, and south. <br />Drainage patterns will not change to any significant degree. No increase in runoff rate is <br />allowed. This is a standard requirement for all development which is enforced both the <br />Watershed District and the City. <br />Parks, Open Space: The comprehensive plan envisions a conceptual greenway on part of this <br />site. In addition, the City approved a new "Parks, Natural Open Space /Greenways and Trails <br />System Plan." Creating greenways to implement the concept presented in the comprehensive <br />plan is the first priority of the new parks and open space plan. This will require the use of a <br />variety of strategies, the most important of which is greater reliance on a conservation <br />development approach to land development. <br />There are 40 acres within existing MUSA and growth area. About 18 acres of this, or 45 %, will <br />be permanent open space. All 10 acres of the plat that are outside of the MUSA will be part of <br />the permanent open space. The total site is 50 acres and the permanent open space will include <br />28 acres, about 56 %. A PUD requires at least 50 %. <br />The preservation of open space on this site will be an important step in the implementation of the <br />greenway vision. This is along the edge of a high value natural feature area that includes a major <br />drainage through the southern part of Lino Lakes. A city trail would be created as part of the <br />plat. The land around the trail likely would be owned by the homeowners association and <br />maintained as perpetual open space through a conservation easement over the area . The <br />specifics, including the easement holder and the terms of the management plan will require more <br />detailed legal documents, which will be worked out prior to final platting as part of the <br />development agreement. <br />