Laserfiche WebLink
ESTIMATE NO. 4 (FINAL) <br />2003 SURFACE WATER MANAGEMENT PROJECTS <br />CITY OF LINO LAKES, MINNESOTA <br />TKDA COMMISSION NO. 12817 -01 <br />PERIOD ENDING: January 31, 2005 <br />ITEM CONTRACT QUANTITY UNIT AMOUNT <br />NO. DESCRIPTION UNIT QUANTITY TO DATE PRICE TO DATE <br />BALD EAGLE AND WOODCHUCK CIRCLE <br />1 MOBILIZATION LS 1.0 1.0 $ 1,750.00 $ 1,750.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 1,200.00 $ 1,200.00 <br />3 REMOVE EXISTING DRIVEWAY CULVERT LF 24.0 34.0 $ 10.00 $ 340.00 <br />4 12" RCP STORM SEWER (CLASS 5) LF 270.0 272.0 $ 47.00 $ 12,784.00 <br />5 12" RCP L.R. BEND (CLASS 5) (4' LENGTH) EA 1.0 1.0 $ 300.00 $ 300.00 <br />6 12" RCP F.E.S. WITH TRASH GUARD (CLASS 5) EA 1.0 2.0 $ 630.00 $ 1,260.00 <br />7 RIP RAP - CLASS II CY 3.0 3.0 $ 120.00 $ 360.00 <br />8 6" AGGREGATE BASE, CLASS 5 TON 10.0 $ 22.00 $ <br />9 SELECT TOPSOIL BORROW (LV) CY 30.0 12.0 $ 12.00 $ 144.00 <br />10 SEEDING AND RESTORATION SY 250.0 350.0 $ 4.00 $ 1,400.00 <br />11 EROSION CONTROL LS 1.0 1.0 $ 100.00 $ 100.00 <br />12 TRAFFIC CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />SUBTOTAL BALD EAGLE AND WOODCHUCK CIRCLE $ 19,938.00 <br />PHEASANT RUN <br />1 MOBILIZATION LS 1.0 1.0 $ 1,800.00 $ 1,800.00 <br />2 REMOVE/SALVAGE/REPLACE FENCE LS 1.0 $ 500.00 $ <br />3 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 600.00 $ 600.00 <br />4 CLEAN EXISTING STORM SEWER PIPE LF 130.0 130.0 $ 6.00 $ 780.00 <br />5 DITCH EXCAVATION CY 40.0 216.0 $ 26.50 $ 5,724.00 <br />6 SODDING AND RESTORATION SY 200.0 315.0 $ 8.00 $ 2,520.00 <br />7 TOPSOIL BORROW (LV) CY 50.0 15.0 $ 1.00 $ 15.00 <br />8 EROSION CONTROL LS 1.0 1.0 $ 100.00 $ 100.00 <br />9 TRAFFIC CONTROL LS 1.0 1.0 $ 1.00 $ 1.00 <br />SUBTOTAL PHEASANT RUN $ 11,540.00 <br />RICE LAKE SCHOOL <br />1 MOBILIZATION LS 1.0 1.0 $ 3,460.00 $ 3,460.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 1,200.00 $ 1,200.00 <br />3 DITCH EXCAVATION CY 500.0 852.0 $ 8.68 $ 7,395.36 <br />4 CLEAN EXISTING STORM PIPE LF 80.0 - $ 12.00 $ <br />5 SEEDING AND RESTORATION AC 0.1 0.3 $ 2,500.00 $ 750.00 <br />6 EROSION CONTROL LS 1.0 1.0 $ 300.00 $ 300.00 <br />7 TRAFFIC CONTROL LS 1.0 1.0 $ 1.00 $ 1.00 <br />SUBTOTAL RICE LAKE SCHOOL $ 13,106.36 <br />2ND AVENUE (AT ULMER DRIVE) <br />1 MOBILIZATION LS 1.0 1.0 $ 2,700.00 $ 2,700.00 <br />2 SEDIMENT EXCAVATION CY 50.0 48.0 $ 23.20 $ 1,113.60 <br />3 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 1,200.00 $ 1,200.00 <br />4 SODDING AND RESTORATION SY 400.0 455.0 $ 5.00 $ 2,275.00 <br />5 SELECT TOPSOIL BORROW (LV) CY 30.0 15.0 $ 12.00 $ 180.00 <br />6 EROSION CONTROL LS 1.0 1.0 $ 100.00 $ 100.00 <br />7 TRAFFIC CONTROL LS 1.0 1.0 $ 100.00 $ 100.00 <br />SUBTOTAL 2ND AVENUE (AT ULMER DRIVE) $ 7,668.60 <br />BALDWIN LAKE ROAD - NORTH OF ASH STREET <br />1 MOBILIZATION LS 1.0 1.0 $ 2,400.00 $ 2,400.00 <br />2 CLEAR AND GRUB TREES /BRUSH LS 1.0 1.0 $ 1,000.00 $ 1,000.00 <br />3 REMOVE EXISTING 60" CMP CULVERT LF 55.0 55.0 $ 16.00 $ 880.00 <br />4 60" RCP STORM SEWER (CLASS 2) LF 36.0 40.0 $ 420.00 $ 16,800.00 <br />5 60" RCP F.E.S. (CLASS 2) EA 2.0 2.0 $ 2,100.00 $ 4,200.00 <br />6 RIP RAP (CLASS III) CY 26.0 26.0 $ 120.00 $ 3,120.00 <br />7 RIP RAP (CLASS II) CY 12.0 12.0 $ 120.00 $ 1,440.00 <br />8 REMOVE BITUMINOUS PAVEMENT (ALL DEPTHS) CY 100.0 96.0 $ 9.00 $ 864.00 <br />9 COMMON EXCAVATION (STREET & CULVERT) - 8 8 - CY 300.0 264.0 $ 9.00 $ 2,376.00 <br />