My WebLink
|
Help
|
About
|
Sign Out
Home
Search
04/06/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
04/06/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 2:52:05 PM
Creation date
1/16/2014 9:48:08 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
04/06/2005
Council Meeting Type
Work Session Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />• <br />Draft <br />Draft Draft <br />Recycle Existing Pavement <br />Financing: Lot/Unit Assessment <br />Commercial /Industrial = 50% of project cost up to maximum <br />assessment rate <br />Residential = 50% of project cost up to maximum assessment rate <br />City contributes balance from General Fund, State Aid <br />Funds, or other sources. <br />B. Street Maintenance. <br />1. Overlay (OCI 40 -70, "Marginal" category) <br />Includes: Crack Filling <br />Milling Surface <br />Patching <br />Pothole Subgrade and Base Correction <br />Repair or Replace Concrete Curb and Gutters <br />1 1/2 Inch Bituminous Surface Overlay <br />Financing: City General Fund or other sources <br />2. Sealcoat (OCI 70 -100, "Adequate" category) <br />Includes: Pothole Filling <br />Crack Filling <br />Sealcoat <br />Financing: City General Fund or other sources <br />IV. PROJECT SELECTION CRITERIA <br />The OCI rating shall serve as the base criteria for project selection. In addition to the <br />OCI, streets shall be evaluated according to Average Daily Traffic (ADT), Stormwater <br />Management, Public Utilities and project priority groupings to achieve economies of <br />scale. The City Engineer shall annually prepare a five year Street Maintenance & <br />Reconstruction Plan based on these criteria for review and approval by the City Council. <br />V. FINANCING <br />The components of the Pavement Management Program (PMP) will be financed as <br />follows: <br />A. Maintenance (Sealcoating and Overlays) — The City will levy a property tax each <br />year to pay for annual maintenance costs as outlined in the PMP. <br />B. Local Street Reconstruction — The City will use: <br />Pavement Management Policy 2 04/04/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.