Laserfiche WebLink
COMPENSATING CHANGE ORDER NO. 3 <br />TWILIGHT ACRES/TWILIGHT ACRES 2ND <br />CI]ZQF LINO LAKES, MINNESOTA <br />IMPROVEMENTS <br />SION NO. 12278 -02 <br />ITEM <br />NO. DESCRIPTION <br />TWILIGHT ACRES <br />1 CLEAR & GRUB TREE <br />2 8" PVC, C900 SANITARY SEWER <br />2A 8" PVC, C900 SANITARY SEWER, 0 -10' <br />23 8" PVC, C900 SANITARY SEWER, 10 -12' <br />2C 8" PVC, C900 SANITARY SEWER, 12 -14' <br />2D 8" PVC, C900 SANITARY SEWER, 14 -16' <br />3 CONSTRUCT 4 DIA. MANHOLE TYPE 301(0 - 10' DEPTH) <br />4 EXTRA DEPTH OF 4' DIA. MH <br />5 8" DIP OUTSIDE DROP CONNECTION (0 -2') <br />6 EXTRA DEPTH 8" DIP OUTSIDE DROP CONNECTION <br />7 4' ON 8' PVC, C -900 WYE BRANCH <br />8 4" PVC, C -900 SAN, SEW. SERVICE PIPE <br />9 4" RIGID POLYSTYRENE INSULATION <br />10 TRENCH STABILIZATION ROCK <br />11 TELEVISE SANITARY SEWER MAINS <br />12 REMOVE CONCRETE DRIVEWAY <br />13 REMOVE BITUMINOUS PAVEMENT <br />14 AGGREGATE BASE CLASS 5 <br />15 2350 TYPE LV 2 OR 3 NON WEAR COURSE <br />16 2350 TYPE LV 4 WEARING COURSE <br />17 CRS -1 BITUMINOUS MATERIAL FOR TACK <br />18 6" CONCRETE DRIVE <br />19 SODDING <br />20 SILT FENCE <br />21 COMMON EXCAVATION - STREET <br />TOTAL TWILIGHT ACRES <br />PERIOD ENDING: March 9, 2005 <br />REVISED <br />CONTRACT QUANTITY +1_ UNIT AMOUNT NET CONTRACT <br />UNIT QUANTITY TO DATE DIFFERENCE PRICE TO DATE CHANGE AMOUNT <br />EA 5.0 3.0 (2.0) $ 1,000.00 $ 3,000.00 $ (2,000.00) $ 5,000.00 <br />LF - $ $ - $ $ <br />LF 255.0 (255.0) $ 29.40 $ - $ (7,497.00) $ 7,497.00 <br />LF 869.0 919.0 50.0 $ 31.81 $ 29,233.39 $ 1,590.50 $ 27,642.89 <br />LF 234.0 421.0 187.0 $ 32.81 $ 13,813.01 $ 6,135.47 $ 7,677.54 <br />LF 55.0 25.0 (30.0) $ 34.50 $ 862.50 $ (1,035.00) $ 1,897.50 <br />EA 8.0 8.0 $ 1,650.00 $ 13,200.00 $ $ 13,200.00 <br />LF 20.2 22.0 1.8 $ 95.00 $ 2,090,00 $ 171.00 $ 1,919.00 <br />EA 1.0 1.0 - $ 2,500.00 $ 2,500.00 $ - $ 2,500.00 <br />LF 7.5 7.5 $ 100.00 $ 750.00 $ - $ 750.00 <br />EA 25.0 25.0 $ 310.00 $ 7,750.00 $ - $ 7,750.00 <br />LF 770.0 883.0 113.0 $ 17.35 $ 15,320.05 $ 1,960.55 $ 13,359.50 <br />SF - - $ - $ $ $ <br />LF 80.0 150.0 70.0 $ 5.00 $ 750.00 $ 350.00 $ 400.00 <br />LF 1,413.0 1,365.0 (48.0) $ 0.98 $ 1,337.70 $ (47.04) $ 1,384.74 <br />SY - - $ - $ $ - $ <br />SY 4,780.0 4,690.0 (90.0) $ 5.00 $ 23,450.00 $ (450.00) $ 23,900.00 <br />TN 56 12,;47.1 560.00 - $ 13.99 $ 7,834.40 $ <br />$ 7,834 <br />TN - - <br />$ $ $ • $ <br />TN $ 5621 $ $ - $ <br />GA - $ - $ - $ $ <br />SY - $ - $ $ - $ <br />SY y - $ 3.89 $ $ - $ <br />LF 60 0 - (60.0) $ 3.00 $ - $ (180.00) $ 180.00 <br />r „ : 360.0 - $ 8.10 $ 2,916.00 $ $ 2,916.00 <br />$ 124,807.05 $ (1,001.52) $ 125,808.57 <br />TWILIGHT ACRES 2ND <br />oili. <br />8" PVC, C900 SANITARY SEWER LF 677.0 688.0 11.0 $ 26.31 $ 18,101.28 $ <br />289.41 $ 17,811.87 <br />NSTRUCT 4' DIA. MANHOLE TYPE 301(0 - 10' DEPTH) <br />RA DEPTH OF 4' DIA MH EA 5.0 5.0 $ 1,650.00 $ 8250.00 $ $ 8,250.00 <br />LF 6.5 6.5 $ 95.00 $ 612.75 $ <br />4 8" DIP OUTSIDE DROP CONNECTION (0 -2') EA 1.0 1.0 $ 612.75 <br />5 EXTRA DEPTH 8" DIP OUTSIDE DROP CONNECTION LF 7.3 7.3 $ 3,285.00 $ 3,285.00 $ $ 3,285.00 <br />6 4" ON 8' PVC, C -900 WYE BRANCH $ 135.00 $ 980.10 $ $ 980.10 <br />7 4" PVC, C -900 SAN. SEW. SERVICE PIPE 7.0 7.0 N. 310.00 $ 2,170.00 $ $ 2,170.00 <br />LF 238.0 297.0 59.0 $ 21.45 $ 6,370.65 $ 1,265.55 $ 5,105.10 <br />8 4" RIGID POLYSTYRENE INSULATION SF 3,660.0 3,940.0 280.0 $ 1.96 5 7,722.40 $ 548.80 $ 7,173.50 <br />9 TELEVISE SANITARY SEWER MAINS LF 677.0 677.0 $ 0.98 $ 663.46 $ <br />10 REMOVE 24" CMP STORM PIPE $ 663.46 <br />LF 12.0 8.0 (4.0) $ 10.00 $ 80.00 $ (40.00) $ 120.00 <br />11 REMOVE CATCH BASIN /MANHOLE EA 2.0 2.0 $ 375.00 $ 750.00 $ - $ 750.00 <br />12 CURB OPENING CATCH BASIN (MnDOT 4021E) EA 2.D 2.0 $ 2,550.00 $ 5,100.00 $ <br />13 24" CMP STORM SEWER PIPE $ 5,100.00 <br />14 CONNECT TO EXISTING STORM SEWER PIPE LF 12.0 8.0 (4.0) $ 26.35 $ 210.80 $ (105.40) $ 316.20 <br />15 REMOVE BITUMINOUS PAVEMENT S 3.0 3.0 - $ 450.00 $ 1,350.00 $ $ 4,885.00 <br />16 AGGREGATE BASE CLASS 5 SY 977.0 972.0 (5.0) $ 5.00 $ 4,860.00 $ (25.00) $ 4,885.00 <br />TN 425.0 450.31 25.3 $ 28.61 $ 12,883.37 $ 724.12 $ 12,159.25 <br />17 2350 TYPE LV 2 OR 3 NON WEAR. COURSE TN - - $ - $ $ $ <br />18 2350 TYPE LV 4 WEARING COURSE TN 110.0 183.9 73.9 $ 129.05 $ 23,734.88 $ 9,539.38 $ 14,195.50 <br />19 CRS -1 BITUMINOUS MATERIAL FOR TACK - _ $ - $ $ $ <br />20 SODDING SY '' <br />21 SILT FENCE° $ 3.89 $ $ $ <br />LF 150.0 (150.0) $ 3.00 $ $ (450.00) $ 450.00 <br />22 COMMON EXCAVATION - STREET CY ,2�° $ 8.10 $ $ $ <br />TOTAL TWILIGHT ACRES 2ND <br />5 97,124.69 $ 11,746.86 $ 85,377.83 <br />ESTIMATE NO. 4 (FINAL) $ 221,931.74 $ 10,745.34 $ 211,186.40 <br />CHANGE ORDER NO. 2 <br />ADDITIONAL ITEMS <br />1 ADD LOCATE AND EXPOSE PRIVATE WATER WELL PER MDH HR 0.50 0.50 $ 650.00 $ 650.00 $ 325.00 $ <br />INSPECTOR REQUIREMENT $ 325.00 <br />2 ADD RESTORE AND GRADE BOULEVARDS TO PREPARE FOR SY 1,032.00 1,032.00 $ 1.00 $ 1.00 $ 1,032.00 $ $ 1,032.00 <br />SODDING <br />3 ADD MOBILIZATION COSTS DUE TO PROJECT DELAY TO MOVE LS 1.00 1.00 $ 2,745.00 $ 2,745.00 $ 2,745.00 $ $ 2,745.00 <br />EQUIPMENT TO PROJECT AND THEN MOVE EQUIPMENT OFF - <br />SITE IN FEBRUARY AND APRIL OF 2002. <br />ADD EXTRA COSTS TO SHAPE AND PREPARE STREET LS 1.00 1.00 $ 3,302.00 $ 3,302.00 $ 3,302.00 $ $ 3,302.00 <br />ITUMINOUS PATCHING FOR TWILIGHT ACRES 2ND DUE TO <br />ROJECT DELAY AND ACCOMPANYING WINTER HOLD OVER. <br />SUBTOTAL ADD ITEMS CHANGE ORDER NO. 2 $ 7,404.00 $ <br />$ 7,404.00 <br />TOTAL COMPENSATING CHANGE ORDER NO. 3 <br />- 4 7 - <br />$ 229,335.74 $ 10,745.34 $ 218,590.40 <br />