My WebLink
|
Help
|
About
|
Sign Out
Home
Search
05/09/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
05/09/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 3:40:02 PM
Creation date
1/16/2014 12:58:50 PM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
05/09/2005
Council Meeting Type
Regular
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRDA <br />•ENGINEERS • ARCHITECTS • PLANNERS <br />MEMORANDUM <br />To: <br />Copies To: <br />Prom: <br />bate: <br />1500 Piper Jaffray Plaza <br />444 Cedar Street <br />Saint Paul, MN 55101 -2140 <br />(651) 292 -4400 <br />(651) 292 -0083 fax <br />www.tkda.com <br />James Studenski, City Engineer Reference: Apollo Landing/Equinox <br />Scott A. Brink, P.E. <br />April 8, 2005 <br />City of Lino Lakes, Minnesota <br />Comm. No. 13265 -002 <br />Routing: <br />Introduction <br />A review dated March 10, 2005 was previously provided for a proposed Planned Unit Development Project <br /><ru.>J) at the northwest corner of the intersection of Apollo Drive and Lilac Drive. The proposed <br />development would essentially consist of five separate buildings of varied types of use (hotel, restaurant, <br />office /retail, office /commercial) on an 8.1 acre site. <br />Ilk- Sine the previous review, the following additional items have been received and reviewed: <br />1 • Cover letter dated March 22, 2005 from Mattke Surveying and Engineering, Inc. <br />2. Spot elevations dated March 17, 2005 for the house located immediately adjacent to the site and <br />existing pond. <br />3- Existing Drainage Calculations dated March 2, 2005. <br />4- Rate control calculations dated March 21, 2005. <br />5 • Storm sewer sizing calculations dated March 21, 2005. <br />6- Full size Grading, Drainage, and Erosion Control Plan dated March 21, 2005. <br />Executive Summary <br />Following is a General summary of the main items and issues that must be addressed. Further explanation of <br />these items and additional items to be addressed are provided in the remainder of this review memorandum. <br />1 <br />The revised drainage information has been reviewed and is acceptable with the following note: The <br />HWL elevation of the pond furthest downstream (Pond 1) cannot be higher than the smaller upstrear. <br />ponds. <br />An Employee Owned Comp. - 5 6 -ling Affirmative Action and Equal Opportunity <br />
The URL can be used to link to this page
Your browser does not support the video tag.