My WebLink
|
Help
|
About
|
Sign Out
Home
Search
06/13/2005 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2005
>
06/13/2005 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2014 3:49:33 PM
Creation date
1/17/2014 11:12:34 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
06/13/2005
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Prior to reconstruction of the street, it is recommended that all sanitary sewer <br />lines be televised and inspected. Any isolated areas that may pose potential <br />problems in the future would be repaired as required. <br />4. Watermain <br />City water is currently not located in the Project area; however, it is available on <br />Ware Road and Birch Street to service this area. The properties are now served <br />with individual wells. Reconstruction of the street provides the most opportune <br />time to add watermain improvements to the properties in this area. <br />It is proposed to extend 8 -inch. diameter ductile iron pipe (DIP) watermain into <br />the Shenandoah Area. This will provide both drinking water and fire protection to <br />the neighborhood. Connection -to existing watermains located on Birch Street <br />and Ware Road would be made. These extensions would provide service to all <br />properties, and would loop the system to provide adequate circulation and <br />pressure. The extent of the water system improvements are shown in the <br />Appendix. <br />Individual 1 -inch copper services would be extended to all properties, at <br />locations as requested by the property owners. Individual property owners are <br />responsible for making arrangements to install the water service from the street <br />right -of -way into the house, and for abandoning their well. <br />V. ESTIMATED PROJECT COSTS <br />Included in the Appendix of this Report are detailed estimates of the construction costs for <br />the Project. The costs are estimated based on recent construction projects in the Lino <br />Lakes area and assume the installation of the improvements would begin in the summer of <br />2007. A summary of total estimated street construction and project costs, including <br />contingencies, easements, and indirect costs is listed as follows: <br />Street and Drainage $ 1,248,000.00 <br />Watermain $ 572,787.50 <br />Total Estimated Project Cost $ 1,820,787.50 <br />6 13371.000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.