Laserfiche WebLink
June 3, 2005 <br />SHENANDOAH AREA <br />(TOTEM TRAIL, HOKAH DRIVE, RICE COURT, HOKAH COURT, ARROWHEAD DRIVE) <br />PROBABLE STREET RECONSTRUCTION & STORM SEWER COSTS <br />Length: 4,050 Feet, Width: 32 Feet (Existing and Proposed) <br />ITEM NO. <br />DESCRIPTION <br />UNIT <br />ESTIMATED <br />QUANTITY <br />ENGINEERS ESTIMATE <br />UNIT <br />PRICE <br />EXTENSION <br />GENERAL CONSTRUCTION <br />1 <br />MOBILIZATION <br />LS <br />0.8 <br />$32,500.00 <br />$26,000.00 <br />2 <br />TRAFFIC CONTROL <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />3 <br />CLEAR TREES <br />EA <br />15 <br />$200.00 <br />$3,000.00 <br />4 <br />GRUB TREES <br />EA <br />15 <br />$200.00 <br />$3,000.00 <br />5 <br />COMMON EXCAVATION <br />CY <br />11,000 <br />$8.00 <br />$88,000.00 <br />6 <br />SUBGRADE EXCAVATION <br />CY <br />1000 <br />$10.00 <br />$10,000.00 <br />7 <br />SELECT GRANULAR BARROW C.V. <br />CY <br />12,000 <br />$12.00 <br />$144,000.00 <br />8 <br />REMOVE AND REINSTALL MAILBOXES /SIGNS <br />LS <br />1 <br />$4,000.00 <br />$4,000.00 <br />9 <br />REMOVE BITUMINOUS DRIVEWAY (ALL THICKNESSES) <br />SY <br />2000 <br />$3.50 <br />$7,000.00 <br />10 <br />REMOVE CONCRETE DRIVEWAY (ALL THICKNESSES) <br />SY <br />130 <br />$5.50 <br />$715.00 <br />11 <br />REMOVE CONCRETE CURB & GUTTER (ALL DESIGNS) <br />LF <br />8400 <br />$4.00 <br />$33,600.00 <br />12 <br />REMOVE BIT. PAVEMENT (ALL THICKNESSES) <br />SY <br />14,000 <br />$2.50 <br />$35,000.00 <br />13 <br />SAWCUT BITUMINOUS <br />LF <br />175 <br />$3.00 <br />$525.00 <br />14 <br />WATER FOR DUST CONTROL <br />PER M <br />49 <br />$20.00 <br />$980.00 <br />15 <br />SUBGRADE PREPARATION <br />RS <br />41 <br />$280.00 <br />$11,480.00 <br />16 <br />AGGREGATE BASE CLASS 5 <br />TON <br />4,800 <br />$13.00 <br />$62,400.00 <br />17 <br />WEAR COURSE MIX (1 - 1/2 ") <br />TON <br />1,300 <br />$38.00 <br />$49,400.00 <br />18 <br />BITUMINOUS MATERIAL FOR TACK <br />GAL <br />720 <br />$2.00 <br />$1,440.00 <br />19 <br />BASE COURSE MIX (2 ") <br />TON <br />1,600 <br />$38.00 <br />$60,800.00 <br />20 <br />B -618 CURB AND GUTTER <br />LF <br />100 <br />$12.00 <br />$1,200.00 <br />21 <br />D -412 CURB AND GUTTER <br />LF <br />8,300 <br />$10.00 <br />$83,000.00 <br />22 <br />6" CONCRETE DRIVEWAY <br />SY <br />130 <br />$35.00 <br />$4,550.00 <br />23 <br />BITUMINOUS DRIVEWAY PATCH <br />SY <br />2000 <br />$17.00 <br />$34,000.00 <br />24 <br />SOD WITH 4" TOP SOIL <br />SY <br />6,000 <br />$3.00 <br />$18,000.00 <br />25 <br />SALVAGE OF SIGNS <br />LS <br />1 <br />$1,000.00 <br />$1,000.00 <br />26 <br />ADJUST MANHOLE COVER/CASTING <br />EA <br />17 <br />$175.00 <br />$2,975.00 <br />27 <br />PERFORATED DRAIN TILE <br />LS <br />500 <br />$10.00 <br />$5,000.00 <br />28 <br />EROSION CONTROL <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />SUBTOTAL STREET CONSTRUCTION <br />$701,065.00 <br />DRAINAGE CONSTRUCTION <br />1 <br />MOBILIZATION <br />LS <br />0.1 <br />$32,500.00 <br />$3,250.00 <br />2 <br />DEWATERING FOR STORM SEWER CONSTRUCTION <br />LS <br />1 <br />$3,000.00 <br />$3,000.00 <br />3 <br />EROSION CONTROL <br />LS <br />1 <br />$4,000.00 <br />$4,000.00 <br />4 <br />CRUSHED ROCK PIPE BEDDING <br />TON <br />100 <br />$8.00 <br />$800.00 <br />5 <br />REMOVE EXISTING STORM SEWER PIPE <br />LF <br />830 <br />$12.00 <br />$9,960.00 <br />6 <br />POND EXCAVATION <br />CY <br />1500 <br />$9.00 <br />$13,500.00 <br />7 <br />24" RCP CLASS V STORM SEWER <br />LF <br />1510 <br />$35.00 <br />$52,850.00 <br />8 <br />24" FES <br />EA <br />2 <br />$1,500.00 <br />$3,000.00 <br />9 <br />48" DIAMETER MANHOLE <br />EA <br />16 <br />$1,500.00 <br />$24,000.00 <br />10 <br />EASEMENTS <br />LS <br />1 <br />$20,000.00 <br />$20,000.00 <br />11 <br />PERMITS <br />LS <br />1 <br />$5,000.00 <br />$5,000.00 <br />SUBTOTAL DRAINAGE CONSTRUCTION <br />$139,360.00 <br />TOTAL <br />CONTINGENCIES (10 %) <br />SUBTOTAL <br />ENGINEERING, LEGAL, ADMINISTRATION (35 %) <br />$840,425.00 <br />$84,042.50 <br />$924,467.50 <br />$323,563.63 <br />TOTAL: STREET AND DRAINAGE CONSTRUCTION <br />$1`,248,000:00, <br />