Laserfiche WebLink
• <br />• <br />• <br />AGENDA ITEM 6C <br />STAFF ORIGINATOR: James E. Studenski, City Engineer <br />COUNCIL MEETING DATE: August 22, 2005 <br />TOPIC: Public Hearing, Lois Lane Utility Extension. <br />VOTE REQUIRED: 3/5 Vote required to close the hearing <br />BACKGROUND: <br />In accordance with a petition from the residents, the City Council ordered a <br />feasibility study for the reconstruction of Lois Lane from 270 feet west of Country <br />Lane to 320 feet west of Meadow View Trail. In addition, this area is not <br />currently serviced with City sanitary sewer or water, which were both included in <br />the study. <br />The street reconstruction portion of the project will be100% funded by <br />assessments. Sanitary sewer and watermain will be funded through <br />assessments and the Trunk Area and Unit Fund. <br />The next step in the process is to close the Public Hearing. The City must allow <br />60 days to elapse following the Public Hearing before any further action can be <br />taken on the proposed project as required by the City Charter. <br />Attached is a copy of Exhibit A showing the proposed sanitary sewer and <br />watermain, and Exhibit B showing the proposed street and storm sewer for this <br />project. <br />OPTIONS: <br />1. Close Public Hearing, <br />2. Continue the Public Hearing. <br />RECOMMENDATION: <br />Option No. 1 - Staff recommends closing the Public Hearing. <br />