Laserfiche WebLink
The following facts were discovered during the course of this investigation: <br />• The dye that was observed in the cistern on the Bachrneier/Chalupsky property <br />does not match the chemical profile for the dye that was introduced into the <br />"observation" pipe for the distribution box on the Muehlstad property; <br />• The observation pipe does not discharge into the distribution box as thought, but <br />simply marks the location of the distribution box; <br />• The drain field at the Muehstadt residence was installed consistent with the rough <br />sketch that was prepared prior to the installation of the drain field; <br />• The termination point of the drain field on the Muhlstadt property is 21 feet from <br />the fence line, the required setback distance is 10 feet <br />• All drain lines that were inspected, terminate in the rock field; <br />• The rock field does not extend into the Bachmeier /Chalupsky property; <br />• No additional drain lines or rock fields were discovered along the property line; <br />• Due to soil and weather conditions the site soils were saturated; and <br />• No evidence of disturbed native soils were observed in the pictures provided by <br />the Bachmeier /Chalupsky's that would indicate that a pipe or drain field was <br />installed onto their property from the Muehlstadt property is evident. <br />Based on the facts discovered during this investigation the following conclusions can be <br />made: <br />• The yellowish hue /dye that was observed in the cistern at Bachmeier /Chalupsky <br />residence was not due to the addition of the dye tablet into the "observation" pipe. <br />• Neither drain field pipe not drain field rock extend from the septic system on the <br />Muehlstadt property to the Bachmeier /Chalupsky property. <br />• Untreated sewage is not being discharge from the septic system on the Muehlstadt <br />property directly onto the Bachmeier /Chalupsky property. <br />• Due to tight soil conditions, and drainage that slopes toward the drain field, this <br />site will experience a high water table after heavy rains. <br />Pinnacle Engineering, Inc. <br />11541 95th Avenue North <br />Maple Grove, Minnesota <br />Page 7 <br />McGrann Shea <br />Project #: MN05170.00 <br />August 16, 2005 <br />