My WebLink
|
Help
|
About
|
Sign Out
Home
Search
02/11/2026 PZ Combined Packet
LinoLakes
>
Advisory Boards & Commissions
>
Planning & Zoning Board
>
Packets
>
2026
>
02/11/2026 PZ Combined Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 10:12:47 AM
Creation date
2/12/2026 10:12:38 AM
Metadata
Fields
Template:
P&Z
P&Z Document Type
P&Z Agenda
Meeting Date
02/11/2026
P&Z Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6.Low maintenance turf should be evaluated throughout the development. <br />Ground covers should be drought resistant to reduce the need for irrigation use. <br />7. Plans show 10’ turf maintenance area. 10’ is not a large enough access area to <br />provide future maintenance and trucking. Lot 25 block one should show <br />maintenance access extending into the drainage and utility easement. <br />a.Turf is acceptable through the yards, but should be native ground cover <br />along the basin and through outlot A. <br />b.Lot 38 of the town homes appears to have turf going into the buffer area <br />along the drainage swale. Additional buffer should be provided where <br />possible to enhance sediment and pollutant removal. <br />8.Provide maintenance access to manhole between lots 37 and 38. Between the <br />retaining wall and drainage swale access for future maintenance looks difficult. <br />9. EOF’s between the stormwater basins and drainage swale should be stabilized to <br />prevent future maintenance and erosion concerns. <br />10.Confirm ownership and maintenance for the drainage swale, understanding is <br />that the city would maintain pipe crossings conveying public drainage. The rest <br />of the system would be privately owned. <br />11.Provide final calculations and plans for the water re-use irrigation system. <br />a.Include maps of green space to be irrigated. <br />b.Maintenance and Use agreements will need to be completed for water <br />re-use. <br />12.The project will disturb more than an acre of soil and will be required to obtain an <br />NPDES permit. Proof of permit shall be required before construction. <br />a.A SWPPP shall be required in additional submittals as required by the <br />MPCA meeting sections 5.2-5.26 <br />b.Final erosion and sediment control will be reviewed with future <br />submittals <br />13.Tree removal should be completed in the fall or winter to minimize impacts to <br />migrating or nesting bat populations <br />Page 2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.