Laserfiche WebLink
EFF <br />$50,001.00 to $100,000.00 <br />$643.75 for the first $50,000.00 plus $7.00 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $100,000.00 <br />100,001.00 to $500,000.00 <br />$993.75 for the first $100,000.00 plus $5.60 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $500,000.00 <br />$500,001.00 to $1,000,000.00 <br />$3,233.75 for the first $500,000.00 plus $4.75 for each <br />additional $1,000.00, or fraction thereof, to and <br />including $1,000,000.00 <br />$1,000,001.00 and up <br />$5,608.75 for the first $1,000,000.00 plus $3.15 for <br />each additional $1,000.00, or fraction thereof <br />Other Inspections and Fees: <br />1. Inspections outside of normal business hours $47.00 per hour* <br />2. Reinspection fee $47.00 per trip <br />3. Erosion Control Reinspection fee $47.00 per trip <br />4. Inspections for which no fee is specifically designed $47.00 per trip <br />5. Additional plan review required by changes, additions, or revisions $47.00 per hour ** <br />6. For use of outside consultants for plan checking and inspections, or both Actual Cost * ** <br />7. Deck Permit Fee Permit fee table based <br />on $10.00 per square foot value <br />8. Basement Finish Permit Fee Permit fee table based <br />on $15.00 per square foot value <br />9. Underground Swimming Pool $141.00, plus state <br />surcharge <br />10. Aboveground Swimming Pool <br />$47.00, plus state <br />surcharge <br />ell. Plan Review Fee <br />a. 65% of the Building Permit Fee <br />b. In instances where two (2) or more permits are issued for a residential structure, the plan review fee shall <br />be forty percent (40 %) per dwelling unit. <br />12. Escrow Fees <br />At the time of the final certificate of occupancy if the following items are not completed, an escrow in the <br />amount indicated will be taken. There are two options for entering into an escrow agreement with the City. <br />The escrow can be paid to the City and an agreement filled out and signed by the payee and City Official, or <br />the title company or lending institution can hold the escrow and fill out an agreement form stating they are the <br />responsible party for holding the funds for the uncompleted items. <br />c. Driveway- $1,000.00 <br />d. Exterior Concrete - $1,000.00 <br />e. Landscaping - $2,500.00 <br />f. As -built Surveys - $1,000.00 <br />g. Stucco (final coat only) - $1,000.00 <br />h. Garage Floor - $1,000.00 <br />2 <br />