Laserfiche WebLink
II. METHOD <br />Washington County shall provide all engineering services and shall cause the construction of <br />Anoka County Project No. S.P. 02- 614 -23 in conformance with said plans and specifications. <br />Washington County shall do the calling for all bids and the acceptance of all bid proposals with <br />concurrence by Anoka County. <br />In accordance with the previously executed Joint Powers Agreement, Anoka County shall <br />reimburse Washington County for all construction and engineering costs for both the Anoka <br />County and City shares of this project. <br />III. COSTS <br />The contract costs of the work, or if the work is not contracted, the cost of all labor, materials, <br />normal engineering costs and equipment rental required to complete the work, shall constitute <br />the actual "construction costs" and shall be so referred to herein. "Estimated costs" are good <br />faith projections of the costs, which will be incurred for this project. Actual costs may vary and <br />those will be the costs for which the relevant parties will be responsible. <br />The estimated construction cost of the total project (including County furnished materials) is <br />$9,459,305.36. Federal funds available for the Project are capped at $4,044,960.00. The federal <br />funds shall be split based on the ratio of eligible cost incurred by each party to the total eligible <br />project cost. Eligible costs are the costs of items that can participate in federal funding as shown <br />on Exhibit A. Participation in the construction cost is as follows: <br />1. The City shall provide construction observation for the relocation and <br />reconstruction of their utilities and approve for acceptance the work as it is completed. <br />2. The City shall pay one hundred percent (100 %) of the hydrant and curb <br />box relocation and gate box adjustment as well as water and sewer relocation and construction. <br />The estimated City cost of these items is $44,445.00. <br />3. The City shall furnish and deliver to the construction site replacement <br />hydrants for any hydrants, which are being relocated as a part of this project, which they want <br />replaced. <br />4. The City shall pay one hundred percent (100 %) for the non - participating <br />and non - eligible portion of the storm sewer construction plus a percentage of the eligible portion <br />of storm sewer construction. The non- eligible and eligible portions are defined in the State <br />Hydraulics letter. <br />5a The estimated cost of the non - participating storm sewer is $0.00 of which <br />the estimated cost to the City is $ 0.00 (100 %). <br />5b. The cost of the eligible portion will be split between the City, in cities <br />greater than 5,000 population, and County based on the ratio of contributing flow <br />determined by the product of contributing area and runoff coefficient. The <br />estimated percentage of contributing flow from the City is sixteen percent (8 %). <br />The total eligible estimated cost of the storm sewer is $184,102.80 of which the <br />estimated cost to the City is $14,728.22. <br />-51 <br />