Laserfiche WebLink
Anoka County Ditch 10 -22 -32 Addendum to the Repair Report <br />, <br />.0 <br />Preliminary Allocation of Cost for Revised Engineer's Recommended Alternative <br />Responsibility <br />Ad valorem Levy <br />Ecological and <br />Irrigation <br />0.0% <br />8 <br />co <br />�R <br />a <br />°4 <br />§ <br />0$ <br />% <br />�I <br />k <br />ie <br />k <br />~ <br />$183,727.14 <br />r $702,727.14 11 <br />72.4% <br />-~ <br />N. <br />_ 0. <br />- La <br />_ eZ <br />Water Management District <br />uncipa u ure <br />Developed and <br />Redeveloped <br />33.3% <br />k <br />%0'0 <br />f <br />$f <br />° <br />8.3% <br />• <br />§ <br />§ <br />K <br />_ <br />$267,376.95 <br />~ <br />33.3% <br />\ <br />k <br />- VI <br />Currently <br />Developed <br />33.3% <br />$68,711.52 I <br />£ <br />S <br />4. <br />2 <br />§ <br />§ <br />33.3% <br />\ <br />ca <br />$13,323.95 <br />Undeveloped <br />33.3% <br />ev <br />e. <br />co CO <br />44 <br />'ax.' <br />f <br />8 <br />K� <br />44 <br />CI <br />44 <br />$89,125.65 <br />cv <br />oi <br />33.3% <br />\ <br />44 <br />$13,323.95 <br />Engineer's Recommended <br />Alternative <br />- <br />V) <br />> <br />b <br />- <br />8 <br />2 <br />S <br />2 <br />k <br /># <br />k <br />2 <br />° <br />- tt <br />«f <br />2J <br />) <br />a. <br />) <br />/ <br />■ <br />\�j <br />4 <br />G <br />E <br />S <br />2 <br />Category Percentages1 <br />Funding Dollars <br />Funding Percentages <br />Base Dollar Amount <br />Percent <br />Dollar Amount <br />Description <br />Core Agricultural and Stormwater Drainage Functions <br />Subtotal <br />I °Separation of Irrigation and Drainage Functions 1 <br />k <br />IlEcological (Wetland Impact Avoidance) <br />k 4 <br />E <br />§ <br />/ <br />c <br />) <br />w. <br />k <br />IL Allocation of Estimated Total Project Cost <br />11Pre-Project Minor Maintenance <br />Subtotal <br />IlContingency <br />(PROJECT TOTAL COST WITH CONTIGENCY <br />Excluding Contingency <br />CO <br />00 <br />)/ <br />0. <br />\§ <br />as <br />co <br />co <br />j\ <br />Lc) CI <br />cl <br />\\ <br />(\ <br />)\ <br />\ <br />3 <br />(13 Cri <br />\ \\ <br />3. Pre - Project Minor Maintenance includes culvert replacements and beaver dam removals upstream of Pine St. <br />Including Contingency <br />0) <br />