Laserfiche WebLink
• <br />410 <br />• <br />9 <br />ballfield backstops <br />$38,640.00 <br />10 <br />concrete mow strip for ballfield fencing <br />$61,800.00 <br />11 <br />dugouts: benches, ball & bat racks <br />$20,000.00 <br />12 <br />bleachers for ballfields <br />$28,000.00 <br />13 <br />ballfield irrigation <br />$135,000.00 <br />14 <br />ballfield seeding <br />$30,000.00 <br />15 <br />agg -lime infields & warning tracks <br />$65,600.00 <br />16 <br />backstop netting <br />$20,000.00 <br />17 <br />concrete pavement for bleachers and dugouts <br />$17,500.00 <br />18 <br />drinking fountain <br />$12,500.00 <br />19 <br />Wetland Mitigation <br />$50,000.00 <br />20 <br />Landscaping: tree and shrub plantings <br />$65,000.00 <br />21 <br />General seedin &outside of ballfields <br />$24,000.00 <br />Area #2 Development - Estimated Subtotal: <br />$1,554,885.00 <br />Professional Fees for Design, Engineering, Surveying, etc. (15 %): <br />Contingency (10 %): <br />Area #2 Development - Estimated Total: <br />$155,488.50 <br />$1,943,606.25 <br />Area #3 Development (Two 200' Ballfields, Tennis Courts, Basketball Court, Hockey Rinks, and related items) <br />Item <br />Description: <br />estimated cost <br />I <br />Site Removals and Grading <br />$140,000.01 <br />2 <br />Stormwater Utilities and Ponding <br />$75,000.01 <br />3 <br />Asphalt pavement for parking lot & roadways (3" asphalt over 6" class 5) <br />$234,750.01 <br />4 <br />Concrete Curb & Gutter for parking lot & roadways <br />$45,360.01 <br />5 <br />Parking lot striping and h.c. signage <br />$3,250.01 <br />6 <br />Asphalt Trails & common gathering spaces (3" asphalt over 6" class 5) <br />$75,000.01 <br />7 <br />Misc. Site Amenities: trash recept., bike racks, benches, etc. <br />$10,000.01 <br />8 <br />ballfield fencing <br />$42,000.01 <br />9 <br />ballfield backstops <br />$1 1,500.01 <br />10 <br />concrete mow strip for ballfield fencing <br />$24,000.01 <br />11 <br />dugouts: benches, ball & bat racks <br />$10,000.01 <br />12 <br />bleachers for ballfields <br />$14,000.01 <br />13 <br />ballfield irrigation <br />$35,000.01 <br />14 <br />ballfield seeding <br />$5,000.01 <br />15 <br />agg -lime infields & warning tracks <br />$17,600.01 <br />16 <br />backstop netting <br />$10,000.01 <br />17 <br />concrete pavement for bleachers and dugouts <br />$8,750.01 <br />18 <br />drinking fountain <br />$12,500.01 <br />19 <br />basketball court (3" asphalt over 6" class 5, basketball goals, line striping) <br />$25,000.01 <br />20 <br />2 tennis courts (3" asphalt over 6" class 5, line striping, chainlink fencing with gates, tennis nets, etc.) <br />$58,500.04 <br />21 <br />lightings system for tennis courts <br />$52,000.01 <br />22 <br />2 asphalt hockey rinks with dasher boards (3" asphalt over 6" class 5) <br />$220,000.04 <br />23 <br />lightings system for hockey rinks <br />$65,000.01 <br />24 <br />Wetland Mitigation <br />$25,000.01 <br />25 <br />Landscaping: tree and shrub plantings <br />$35,000.04 <br />26 <br />General seeding outside of ballfields <br />$14,000.01 <br />$1,268,210.01 <br />Area #3 Development - Estimated Subtotal: <br />Professional Fees for Design, Engineering, Surveying, etc. (15%): <br />Contingency (I 0 %): <br />Area #3 Development - Estimated Total: <br />$126,821.00 <br />$1,585,262.50 <br />Area #4 Development (Two South Soccer Fields, Two 200' Ballfields, One 275' Ballfield, and related items) <br />Item <br />Description: <br />estimated cost <br />I <br />Site Removals and Grading <br />$185,000.0 <br />2 <br />Stormwater Utilities and Ponding <br />$25,000.0 <br />3 <br />Asphalt Trails & common gathering spaces (3" asphalt over 6" class 5) <br />$88,750.0 <br />Page 2 of 4 <br />