Laserfiche WebLink
conditions for the ZAYO Equipment and a comparable accessibility to the ZAYO <br />Equipment. <br />V. CONNECTIVITY SERVICE LEVEL REQUIREMENTS <br />A. Anoka County, through its agreement with ZAYO, shall provide <br />Connectivity Services to Entity at the capacity level indicated in Attachment A. Any <br />upgrades to service will be dependent on costs of Equipment, fees to ZAYO, capacity <br />limitations of the network, and other relevant factors. Entity recognizes that the network <br />has a total bandwidth of 10GB on the core ring and 1 GB on distribution rings and <br />distribution laterals. This total capacity is shared among other Community Anchor <br />Institutions which are part of this project. Entity agrees to work with Anoka County to <br />manage bandwidth and equitably resolve capacity issues on the network. <br />B. Dark fibers will be installed at each co- location service site as indicated in <br />Attachment A. These dark fibers will be terminated at the site and are reserved for <br />future use. This agreement neither contemplates nor conveys to Entity present or future <br />rights to the use of the dark fiber. Any future use will be by a separate agreement and <br />at an additional cost. <br />C. Entity may use the network only to provide service to itself, and agencies <br />and departments of the Entity in keeping with the Permitted Uses of this Agreement. <br />D. Transport Availability: The transport services being provided will meet or <br />exceed 99.999% network availability for protected optical service, 99.99% for protected <br />TDM based services such as DS3s and DS1s and 99.9% for unprotected services as <br />measured on a monthly basis. If Network Availability is below the percentage above in <br />two out of the three preceding calendar months not due to an Excused Outage, the <br />same shall constitute an event of default hereunder. <br />7 <br />March 28, 2011 Final <br />