My WebLink
|
Help
|
About
|
Sign Out
Home
Search
03/28/2011 Council Packet
LinoLakes
>
City Council
>
City Council Meeting Packets
>
1982-2020
>
2011
>
03/28/2011 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2014 11:14:06 AM
Creation date
1/28/2014 9:05:14 AM
Metadata
Fields
Template:
City Council
Council Document Type
Council Packet
Meeting Date
03/28/2011
Council Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• <br />ATTACHMENT E <br />Service Level Requirements <br />I. Introduction <br />The following standards and requirements are intended to ensure optimum network performance <br />for all Community Anchor Institutions and Co- location Sites subscribing to Connectivity <br />Services on the ZAYO System as defined and described in this Agreement. These standards <br />shall be observed by the Entity, ZAYO, Anoka County and their respective employees, agents <br />and contractors in installing all new internal ZAYO System interfaces and Equipment, in <br />modifying existing installations, and in operating Equipment on the ZAYO System. These <br />standards and requirements have been agreed upon by Anoka County, ZAYO and the Entity. <br />II. Installation at Co- location Sites <br />The ZAYO System, ZAYO Equipment and any County Equipment shall be installed to the <br />Demarcation Point on or at the designated Co- location Sites within specified Community Anchor <br />Institutions to receive Connectivity Service, to provide Connectivity Services to other authorized <br />entities on the ZAYO System, or to furnish other services to commercial customers. Internal <br />wiring to communications and terminal equipment on the Entity's side of the Demarcation Point <br />is generally the responsibility of the Entity. <br />ZAYO or Anoka County shall provide the Entity with a written description showing all work to <br />be performed, specific electrical and environmental requirements for each Co- location Site, and <br />the specific location of the Demarcation Point between the ZAYO System and the Entity's <br />network and equipment. <br />III. Signal Quality <br />The ZAYO System shall achieve the performance standards listed below under worst -case <br />conditions for communications occurring between each Community Anchor Institution and Co- <br />location Site and ZAYO's central office or network control center. <br />A. Data Communications - For any data communications link on the ZAYO System, including <br />all ZAYO Equipment, the bit error ratio (BER) shall be equal to or better than 1 x 10 to the <br />minus 9, provided the Entity provided premises equipment meets or exceeds, and is operating <br />to these specifications. In addition, jitter and latency on all portions of the ZAYO System <br />shall not exceed IOOms. <br />B. ZAYO System Availability - For each Community Anchor Institution/Co- location Site on the <br />ZAYO System that subscribes to Connectivity Services, system or network availability shall <br />1 <br />P37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.