|
Q
<br />N
<br />0
<br />H
<br />0
<br />0.
<br />2
<br />-J
<br />U
<br />W
<br />5J
<br />? Z 10
<br />J Q O
<br />LL W "2
<br />O C
<br />0 V) N
<br />D
<br />Z
<br />Previously Assessed (Fund 423)
<br />Other: Sewer Utility Fund
<br />Other: Subj to referendum
<br />Other: Sewer Utility Fund
<br />Other: Sewer Utility Fund
<br />TOTAL
<br />125,000
<br />445,000
<br />90,000
<br />70,000
<br />60,000
<br />0 O O P 0
<br />O1..
<br />m
<br />§§§§§§§ c C C ¢
<br />co O co' 0000
<br />V m P�mmm N
<br />R
<br />180,000
<br />490,000
<br />40,000
<br />67,500
<br />400,000
<br />340,000
<br />1 017 500
<br />180,000
<br />515,000
<br />691,000
<br />50,000
<br />70,000
<br />236,500
<br />' o O o O ° O O O 0 O O C c
<br />J O O u%V%000
<br />r mINr ?lm `
<br />ILb,000
<br />445,000
<br />0
<br />D
<br />�Omm
<br />1) 1-
<br />o° o
<br />0 0 0
<br />o m 0
<br />°c
<br />O
<br />o o
<br />0 0
<br />0 0
<br />mrn
<br />1- d'
<br />o
<br />o 0 0
<br />0 0 0
<br />Ls 1°n
<br />N
<br />o o
<br />0 0 0
<br />o O o
<br />emv
<br />r N 1'
<br />1
<br />00
<br />v ui
<br />m N
<br />m m
<br />4
<br />2,203,000
<br />Assess
<br />FUTURE PROJECTS
<br />12th Ave (Birch to Holly Dr) (MSA)
<br />CSAH 23 Reconstruction (77th to Main) City Share
<br />Raw watermain to wells 1.3,5 and 6
<br />Water Treatment Plant
<br />Redundant 16" Water rain Loop (Birch St)
<br />8
<br />c
<br />N
<br />i . .
<br />0
<br />F.
<br />�
<br />O
<br />ry
<br />70,000
<br />60,000
<br />130,000
<br />10 °
<br />..3-
<br />N
<br />312,500
<br />67,500
<br />400,000
<br />467,500
<br />70,000
<br />O , 0
<br />°r n
<br />75,000
<br />1,055,000
<br />O
<br />O
<br />lh
<br />m O
<br />Q'
<br />m
<br />MSAS
<br />0
<br />N
<br />M
<br />1,320,000
<br />1,320,000
<br />°
<br />rn r
<br />000'06
<br />N
<br />78,500
<br />40,000
<br />O ,
<br />O
<br />m
<br />160,000
<br />368,500
<br />0 0-
<br />0. E
<br />Oi N
<br />0
<br />N
<br />340,000
<br />238.500
<br />8$ o
<br />N
<br />N N 6 O
<br />N W St m
<br />O V
<br />4,405,000
<br />6,178,000
<br />r'KVJCI. I
<br />Surface Water Management Project'
<br />Seal Coat and Overlay Project
<br />Local Surface Water Management Plan Update
<br />Upgrade Lift Station No. 7
<br />Sanitary Sewer Rehab`
<br />Total
<br />Surface Water Management Project
<br />Seal Coat and Overlay Project
<br />Cedar Street
<br />2014 Reconstruction Feasibility Study
<br />Main /Lake Intersection Improvements
<br />Ware /Birch Intersection Improvements
<br />Well No. 6 & Pumphouse
<br />Sanitary Sewer Rehab
<br />Ext
<br />Woodridge Estates Trunk Watermain
<br />total
<br />Surface Water Management Project
<br />Seal Coat and Overlay Project
<br />RMP Implementation w /RCWD
<br />Sanitary Sewer Rehab
<br />Water Tower No. 1 Painting
<br />Surface Water Management Project
<br />Seal Coat and Overlay Project
<br />2014 Street Reconstruction'
<br />2016 Street Reconstruction Feasibility Study°
<br />Sanitary Sewer Rehab
<br />E t T k Watermain FM
<br />Woodridge sla es run
<br />Total
<br />Surface Water Management Project
<br />Seal Coat and Overlay Project
<br />Holly Dr (Holly Ct to Cnty J (MSA)
<br />Sanitary Sewer Rehab
<br />Booster Station
<br />Well No 7
<br />2.5 M gal Ground Storage
<br />r_._,. ,n...,... r.e.,... an!, n,., ,n lFme CMv1
<br />d
<br />O
<br />rn
<br />m
<br />0
<br />E
<br />w°
<br />C
<br />G.0
<br />O
<br />m
<br />0
<br />0
<br />U
<br />m
<br />U
<br />0
<br />C
<br />O
<br />C
<br />0
<br />a
<br />Other
<br />1
<br />FUTURE PROJECTS
<br />12th Ave (Birch to Holly Dr) (MSA)
<br />CSAH 23 Reconstruction (77th to Main) City Share
<br />Raw watermain to wells 1.3,5 and 6
<br />Water Treatment Plant
<br />Redundant 16" Water rain Loop (Birch St)
<br />10-
<br />�
<br />O
<br />ry
<br />
|